Bidding and Current Projects

IMG_2635

Projects Bid Tabs

Peoria Projects

ProjectInformationDates

Pavement Patching at Grand View Drive

RFQ-GVD Pavement Patching

 

Project Manager:

Michael Friberg

A pre-quote meeting has been set for Tuesday, April 4, 2023 at 9:00 a.m. at the Grand View Drive Pimiteoui overlook. The Pimiteoui overlook is the turnout close to the intersection of Grand View Drive and Glen Avenue. All of the proposed patches have been marked in white paint, so attendance at the pre-quote meeting is not mandatory.

Quotes are due Tuesday, April 11, 2023 at 2:00 p.m. by email to mfriberg@peoriaparks.org

Site Improvements Forest Park Nature Center

Download Planholder List CSV

Project Manager: Mary Harden

 

Addendum 1 Site Improvements FPNC

Sealed bids will be received until 1:15 p.m., Tuesday, April 4, 2023, prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

 

A pre-bid meeting will be held at 1:30 p.m. on Tuesday, March 28, 2023 at the project site.

 

 

Exterior Door Replacement- Forest Park Nature Center

Download Planholder List CSV

Project Manager: Dave Voorhees

Sealed bids will be received until 2:15p.m., Tuesday, April 11, 2023, prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

 

A pre-bid meeting will be held at the site on Tuesday, April 4, 2023 at 9:00 a.m.

Roof Coating- Franciscan Recreation Center

Download Planholder List CSV

Project Manager: Dave Voorhees

Sealed bids will be received until Tuesday, April 11, 2023, 2:30 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

 

A pre-bid meeting will be held at the site on Tuesday, April 4, 2023 at 10:30 a.m.

Bridge Repair – Rock Island Greenway

Download Planholder List CSV

Project Manager:

Mike Friberg

For Addendum #2, click HERE

For Addendum #1, click HERE

Sealed bids will be received until TUESDAY, APRIL 4, 2023 at 1:20 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the bridge on Tuesday, March 28 at 9:00 a.m.

Locker Room Renovation Phase 2 – Riverplex Recreation and Wellness Center

Download Planholder List CSV

Project Manager:

Becky Fredrickson

For Addendum #1, click HERE

Sealed bids will be received until 1:00 pm, Tuesday, March 28, 2023, prevailing time, by the Owner, at the Peoria Park
District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the RiverPlex on Wednesday, March 22, 2023 at 10:00am.

Parking Lot Repaving – Peoria Playhouse Children’s Museum

Download Planholder List CSV

Project Manager:

Mike Friberg

Sealed bids will be received until APRIL 4, 2023 at 1:30 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the Peoria Playhouse Parking lot in Glen Oak Park on Tuesday, March 21, 2023 at 10:00 a.m.

Safety Town Bridge Railing – Rebid

Download Planholder List CSV

Project Manager:

Mike Friberg

Bids due Tuesday, April 4, 2023 at 1:00 p.m. at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at Bicycle Safety Town, 6518 N. Sheridan Road, Peoria, Illinois on Tuesday, March 21, 2023 at 9:00 a.m.

Irrigation Controls Replacement- Newman Golf Course

Download Planholder List CSV

Project Manager: Dave Voorhees

 

ADDENDUM 01 Newman Irrigation Controls #22-029

Sealed bids will be received until 1:30 p.m., Tuesday, March 14, 2023, prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

 

A pre-bid meeting will be held at the site on Tuesday, March 7, 2023 at 9:00 a.m.

Roof Coating RiverPlex

Download Planholder List CSV

Project Manager: Dave Voorhees

ADDENDUM 1 Roof Coating – Rplex #23-041

Sealed bids will be received until 2:00 p.m on Tuesday, March 14, 2023, prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the RiverPlex on Tuesday, March 7, 2023 at 10:30 a.m.

Irrigation Pump House Piping & Backflow Preventer

Download Planholder List CSV

Project Manager: Dave Voorhees

Sealed bids will be received until 2:30 pm on Tuesday, February 7, 2023, prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Boiler Replacement – Peoria Players Theatre

Download Planholder List CSV

Addendum No 1 – PPT Boiler Replacement

 

Project Manager

Michael Friberg

Sealed bids will be received until TUESDAY, JANUARY 17 at 1:00 p.m. prevailing time, by the Owner, at the Peoria
Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the Peoria Players Theatre on Tuesday, January 10, 2022 at 9:00 a.m.

 

Roof Replacements- Attached Garage and Detached Shed- Tawny Oaks

Download Planholder List CSV

Project Manager: Dave Voorhees

 

ADDENDUM 1 Attached Garage and Detached Shed Roof Tawny Oaks

Sealed bids will be received until 1:30 p.m. on Tuesday, November 29, 2022, prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

 

A pre-bid meeting will be held at the site on Tuesday, November 22, 2022 at 10:00 a.m.

Boardwalk Repairs & Resurfacing

Download Planholder List CSV

Project Manager: Dave Voorhees

 

Boardwalk Repairs Addenda 01

Sealed bids will be received until 1:30 p.m., Tuesday, November 1, 2022, prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Bridge Repair – Rock Island Greenway Bridge @ Knoxville Ave.

Download Planholder List CSV

Project Manager:

Michael Friberg

Sealed bids will be received until NOVEMBER 1, 2022 AT 1:00 P.M. prevailing time at the Peoria Park
District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the bridge at 9:00 a.m. on Tuesday, October 25, 2022.

Stormwater Inlet Replacements – Peoria Playhouse Children’s Museum

RFQ-PlayhouseStormwaterInlets

Addendum #1

Project Manager:

Mike Friberg

Quotes Due: October 19th at 2:00 p.m.

Parking Lot Reconstruction – Peoria Playhouse Children’s Museum

Download Planholder List CSV

Addendum #1

 

Project Manager:

Mike Friberg

 

 

Pre Bid: September 13 at 9:00 a.m.

Bids Due: Sealed bids will be received until Tuesday, SEPTEMBER 20, 2022 AT 1:00 P.M. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614

RFP- Lease of Training Room- Lakeview Recreation Center

Download Planholder List CSV

Project Manager: Scott Loftus

 

Lakeview Rec Floor Plan

Sealed proposals will be received until 10:00 a.m., Friday, September 30, 2022, prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL 61614.

Vestibule Roof Replacement- Equipment Service Center Bradley Park

Download Planholder List CSV

Project Manager:

Dave Voorhees

Sealed bids will be received until 2:30 p.m., Tuesday, September 6, 2022 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Exterior Painting- Peoria PlayHouse Children’s Museum

Download Planholder List CSV

Project Manger:

Dave Voorhees

 

ADDENDUM 1 EXTERIOR PAINTING – PEORIA PLAYHOUSE

Sealed bids will be received until 2:45 p.m., Tuesday, September 6, 2022 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Curb and Gutter Improvements- Bradley Park

Download Planholder List CSV

Project Manager: Mary Harden

Sealed bids will be received until 1:30 p.m. on August 16, 2022 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Request for Quotes: Concrete Dumpster Pad Approach

RFQ Dumpster Pad Approach

Project Manager:

Mike Friberg

Quotes Due Tuesday, July 12, 2022. Quotes may be emailed (to mfriberg@peoriaparks.org), delivered, or mailed to the planning offices.

District-Wide Chip and Seal 2022

Download Planholder List CSV

For Addendum #1, Click HERE

 

Project Manager:

Mike Friberg

Sealed bids will be received until JULY 5, 2022 at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Boiler Replacement – Peoria Players Theatre

Download Planholder List CSV

Addendum #2

Pre-bid meeting time change! Addendum #1

 

Project Manager:

Mike Friberg

Sealed bids will be received until TUESDAY, JULY 5, 2022 at 1:15 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the Peoria Players Theatre on Tuesday, June 28 at 1:00 p.m.

Front Door Replacement- Owens Center and Noble Center

Download Planholder List CSV

Project Manager:

Dave Voorhees

 

Addendum 1 Front Door Replacement Owens Center and Noble Center

Sealed bids will be received until 1:00 p.m. on Tuesday, June 28, 2022 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

 

A pre-bid meeting will be held at Tuesday, June 21, 2022 at 9:00am. Please meet at the Noble Center.

 

 

Park Improvements- Trewyn Park

Download Planholder List CSV

Project Manager: Mary Harden

ADDENDUM 1 Park Improvements Trewyn park

A pre-bid meeting will be held at Trewyn Park on Tuesday, May 31, 2022 at 9:00 a.m.

Sealed bids will be received until 2:30 p.m., Tuesday, June 7, 2022 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Avenue, Peoria, IL 61614.

Roof Replacement – Logan Recreation Center

Download Planholder List CSV

Project Manager:

Dave Voorhees

A pre-bid meeting will be held at Logan Park on Tuesday, May 10, 2022 at 10:00 am.

Sealed bids will be received until 1:15 PM, Tuesday, May 17, 2022 prevailing time, by the Owner, at the Peoria Park
District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Locker Room Renovation – Riverplex Recreation & Wellness Center

Download Planholder List CSV

Project Manager:

Becky Fredrickson

Sealed bids will be received until 1:00 pm, Tuesday May 17, 2022 prevailing time, by the Owner, at the Peoria Park
District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Basketball Court Pavement Renovation – John H. Gwynn Jr. Park

Download Planholder List CSV

Project Manager:

Mike Friberg

A pre-bid meeting will be held at the project site on May 3, 2022 at 9:00 a.m.

Sealed bids will be received until MAY 10, 2022, at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614

Request for Quotes: Wall Repair – Riverplex Recreation and Wellness Center

RFQ Rplex wall repairs_4-19-22 combined final

 

Project Manager: Dave Voorhees

Please submit written quotes by Tuesday, May 03, 2022 at 2:00 p.m. Quotes may be delivered, mailed, faxed, or
emailed (dvoorhees@peoriaparks.org) to the Planning Offices.

Shed Roof Replacement- Sommer Farm

Download Planholder List CSV

Project Manager: Dave Voorhees

Sealed bids will be received until 1:15 pm, Tuesday, April 12, 2022 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL 61614.

A pre-bid meeting will be held at Sommer Farm on Wednesday, April 6, 2022 at 9:00 am.

Roof Replacement- Kellogg Golf Course Service Building

Download Planholder List CSV

Project Manager: Dave Voorhees

ADDENDA 01 KELLOGG SERVICE BLDG ROOF

Sealed bids will be received until 1:30 pm, Tuesday, April 12, 2022 prevailing time,  by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL 61614.

A pre-bid meeting will be held at Kellogg Golf Course at the service building on Wednesday, April 6, 2022 at 10:30 am.

Shelter Roof Replacement Laura Bradley Park

Download Planholder List CSV

Project Manager: Dave Voorhees

 

Addendum 1 Shelter Roof Bradley Park

Sealed bids will be received until Tuesday, April 5, 2022, at 2:30p.m., prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the site on Tuesday, March 29, 2022 at 11:00 a.m.

Request for Quotes- Flooring Removal and Replacement Logan Rec Center

RFQ- Flooring removal and replacement Logan Rec Center

 

Project manager: Mary Harden

Please submit written quotes by Tuesday, March 22, 2022 at 2:00 p.m. Quotes may be delivered, mailed, faxed, or emailed (mharden@peoriaparks.org) to the Planning Offices at 1314 N Park Road, Peoria, IL 61604.  Late quotes will not be accepted.

 

A pre-quote meeting will be held at the site on Tuesday, March 15, 2022 at 8:30 a.m.

Pool Resurfacing- RiverPlex Recreation & Wellness Center

Download Planholder List CSV

Project Manager: Becky Fredrickson

ADDENDUM 1_RiverPlex Pool Resurfacing

Sealed bids will be received until 1:00p.m., Tuesday, March 29, 2022 prevailing time, by the Owner, at the Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL 61614.

 

A pre-bid meeting will be at the site on Wednesday, March 16, 2022 at 10:00 a.m. The pools can be viewed during normal facility hours.

Natatorium Painting- RiverPlex Recreation & Wellness Center

Download Planholder List CSV

Project Manager: Becky Fredrickson

ADDENDUM 1_RiverPlex Natatorium Painting

Sealed bids will be received until 1:15 p.m. prevailing time, Tuesday, March 29, 2022 by the Owner at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL 61614.

 

A pre-bid meeting will be held at the site on Wednesday, March 16, 2022 at 11:00 a.m.

Partial Roadway Replacement Phase 2 – Peoria Stadium

Download Planholder List CSV

Project Manager: Mike Friberg

Sealed bids will be received until Tuesday, March 15 at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the project location on Tuesday March 8, 2022 at 9:00 a.m.

Asphalt Path Replacement – Rock Island Greenway – Route 6 to Chanute Road Phase 1

Download Planholder List CSV

ADDENDUM 1-Route6toChanute

 

Project Manager:

Mike Friberg

Sealed bids will be received until TUESDAY, MARCH 15, 2022 AT 1:15 P.M. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the intersection of Chanute Road and the Rock Island Greenway on Tuesday, March 8 at 10:30 a.m.

Bridge Railing Improvement – Laura Bradley Park

Download Planholder List CSV

Project Manager: Mike Friberg

Sealed bids will be received until March 1, 2022 at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid will be held at the project site on Tuesday, February 22, 2022 at 9:00 a.m. Enter the park at Farmington and Park Roads, and take the first left. Cross over the bridge with the beautiful aluminum railings and bear right. Continue and park before the stop sign.

Safety Town Bridge Railing

Download Planholder List CSV

Project Manager: Mike Friberg

Sealed bids will be received until February 22, 2022 at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held  on Tuesday February 15, 2022 at 9:00 at Safety Town.

 

Exterior Column Repair- Golf Learning Center

Download Planholder List CSV

Project Manager: Mary Harden

Sealed bids will be received until Tuesday,  February 8, 2022 at 1:30 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Avenue, Peoria, IL 61614.

 

A pre-bid meeting will  be held at the site on Tuesday, February 1, 2022 at 10:00 a.m.

Exterior Improvements- Madison Club House

RFQ Madison Exterior Improvements ReQuote

Please submit written quotes to mharden@peoriaparks.org by 1:00 p.m. Thursday, October 28, 2021.

Exterior Improvements- Madison Golf Course Club House

Request for Quotes  RFQ Madison Club House Exterior Improvements

Please submit written quotes by Tuesday, October 5, 2021 by 1:00 p.m.

 

A pre-quote meeting will be held at the site on September 28, 2021 at 1:00 p.m.

Asphalt emulsion sealcoating – Rock Island Greenway Knoxville Ave to Glen Ave

Request for Quotes: RFQ-AsphaltEmulsionSealcoating

Please submit written quotes by Tuesday, August 3, 2021, at 2:00 p.m. Quotes may be emailed to mfriberg@peoriaprks.org .

Chip and Seal 2021 – District-Wide

Download Planholder List CSV

Project Manager:  Mike Friberg

Sealed bids will be received until Tuesday, July 27, 2021, at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

There is no pre-bid meeting for this project.

Pool Resurfacing – RiverPlex

Download Planholder List CSV

Project Manager:  Becky Fredrickson

Sealed bids will be received until Tuesday, July 20,  2021, at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

A pre-bid meeting will be held on Friday, July 9, 2021, at 9:00 a.m. at the RiverPlex Recreation & Wellness Center.

Partial Roadway Replacement – Peoria Stadium

Download Planholder List CSV

Project Manager:  Mike Friberg

Sealed bids will be received until Wednesday, July 7, 2021, at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

A pre-bid meeting will be held on Tuesday, June 29, 2021, at 9:00 a.m. at 315 E. War Memorial Drive (Peoria Stadium).

Masonry Repairs – Proctor Recreation Center

Download Planholder List CSV

Project Manager:  Becky Fredrickson

Addendum 1_Proctor Masonry Repairs

Sealed bids will be received until Tuesday, June 15, 2021, at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

A pre-bid meeting will be held on Tuesday, June 8, 2021, at 11:00 a.m. at Proctor Recreation Center.

Curb & Gutter Improvements – Glen Oak Park Lower

Download Planholder List CSV

Project Manager:  Mary Harden

Addendum 1 Curb and Gutter Improvements Glen Oak Park

Sealed bids will be received until Tuesday, June 1, 2021, at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

A pre-bid meeting will be held on Tuesday, May 25, 2021 at 8:30 a.m. at the project site.

Curb & Gutter Improvements – Bradley Park Lower

Download Planholder List CSV

Project Manager:  Mary Harden

Addendum 1 Curb and Gutter Improvements Bradley Park

Sealed bids will be received until Tuesday, June 1, 2021, at 1:15 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

A pre-bid meeting will be held on Tuesday, May 25, 2021, at 10:00 a.m. at the base bid section of the project site.

Tennis Court Surface Improvements Re-Bid – Bradley Park

Download Planholder List CSV

Project Manager:  Mary Harden

ADDENDUM_1_Tennis Court Surface Improvements REBID Bradley Park

Sealed bids will be received until Tuesday, May 18, 2021, at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

A mandatory pre-bid meeting will be held on Tuesday, May 11, 2021, at 9:30 a.m. at the tennis courts in Bradley Park.

RFP Franciscan Recreation Center Lease

Download Planholder List CSV

Project Manager:  Becky Fredrickson

Sealed proposals will be received until Friday, June 4, 2021, at 1:00 p.m. prevailing time, by the Owner, at the Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

 

Tennis Court Surface Improvements – Bradley Park

Download Planholder List CSV

Project Manager:  Mary Harden

Sealed bids will be received until April 6, 2021, at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

There will be no pre-bid meeting for this project.

Tennis Court Surface Improvements – Glen Oak Park

Download Planholder List CSV

Project Manager:  Mary Harden

Sealed bids will be received until April 6, 2021, at 1:15 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

There will be no pre-bid meeting for this project.

Roadway Bridge and Approaches – Bradley Park South Bridge

Download Planholder List CSV

Project Manager:  Mike Friberg

ADDENDUM ONE-RoadwayBridgeBradleyPark

ADDENDUM TWO-RoadwayBridgeBradleyPark

ADDENDUM THREE-RoadwayBridgeBradleyPark

Sealed bids will be received until April 6, 2021, at 1:30 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

A pre-bid meeting will be held on Tuesday, March 23, 2021, at 9:00 a.m. at the project site in Bradley Park over the east branch of Dry Run Creek.

Lodge Kitchen Exhaust Hood – Peoria Zoo

Download Planholder List CSV

Project Manager:  Becky Fredrickson

Addendum 1_Zoo Lodge Kitchen Exhaust Hood

Sealed bids will be received until Tuesday, March 30, 2021, at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

A pre-bid meeting will be held on Tuesday, March 23, 2021, at 10:00 a.m. at the Peoria Zoo, African Lodge Kitchen.

Asphalt Path Replacement – Allen to Route 6 Rock Island Greenway

Download Planholder List CSV

Project Manager:  Mike Friberg

Sealed bids will be received until Tuesday, March 23, 2021, at 1:00 p.m. prevailing time, by the Owner at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

A pre-bid meeting will be held on Tuesday, March 16, 2021, at 9:00 a.m. at the intersection of Allen Road and the bike trail.

RFP Management of Peoria Zoo & Luthy Botanical Garden Rentals

Download Planholder List CSV

Project Manager:  Nicole Staley

 

 

Sealed proposals will be received until 2:00 p.m., Friday, April 16, 2021, prevailing time, by the District, at the Peoria Park District Administrative Office, 1125 W. Lake Avenue, Peoria, IL  61614.

There will be no pre-proposal meeting.  Proposers may individually schedule a time during the week of March 22, 2021.

Accessible Parking and Path Improvements – Madison Golf Course

Download Planholder List CSV

Project Manager:  Mary Harden

 

ADDENDUM_1_Madison Accessible Parking19-017

Sealed bids will be received until Tuesday, March 16, 2021, at 1:15 p.m. prevailing time, by the Owner at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL 61614.

A pre-bid meeting will be held on Tuesday, March 9, 2021, at 10:00 a.m. at Madison Golf Course.

Natatorium HVAC Replacement – Riverplex

Download Planholder List CSV

Project Manager:  Becky Fredrickson

Addendum No1_RiverPlex HVAC Repl

Addendum No2_RiverPlex HVAC Repl

Addendum No3_RiverPlex HVAC Repl

Addendum No4_RiverPlex HVAC Repl

Sealed bids will be received until Tuesday, March 16, 2021, at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL  61614.

A pre-bid meeting will be held on Tuesday, March 2, 2021, at 9:00 a.m. at the Riverplex.

RFQ Floor Insulation – Camp Wokanda Lodge

Request for Quote: RFQWokandaLodgeFloorInsulation

Project Manager:  Mike Friberg

Written quotes must be submitted by Tuesday, February 16, 2021, at 2:00 p.m.  Quotes may be e-mailed to mfriberg@peoriaparks.org.

A pre-quote meeting will take place on February 9, 2021, at 9:00 a.m. at the Lodge.

RFQ Stairway Blinds – Lakeview Recreation

Request for Quote:  Lakeview Stairway Blinds

Project Manager:  Mike Friberg

Written quotes must be submitted by Wednesday, January 27, 2021, at 2:00 p.m.  Quotes may be e-mailed to mfriberg@peoriaparks.org.

Purchase of Dredge, Trailer, and Accessories

Download Planholder List CSV

Project Manager:

Mike Friberg

Bids are due Tuesday November 3, 2020 at 1:00 p.m.

PLEASE MAKE SURE YOU MAIL YOUR BID EARLY ENOUGH!!

Parking Lot Striping – Lakeview and Detweiller Parks

Request for Quote: Parking Lot Striping at Lakeview and Detweiller Parks.

 

Project Manager:

Mike Friberg

Quotes due by October 8, 2020 at 2:00 p.m.

Nature Center Exhibits – Forest Park Nature Center

Download Planholder List CSV

Project Manager:  Mary Harden

Addendum 1 Nature Center Exhibits 10022020

Sealed bids will be received until Tuesday, October 13, 2020, at 1:00 p.m. prevailing time, by the Owner, and the Peoria Park District Administrative Office, 1125 W Lake Avenue, Peoria, IL.

A pre-bid meeting will be held on Wednesday, September 30, 2020, at 11:00 a.m. at the Forest Park Nature Center.

RFQ Curb & Gutter – Glen Oak Park

Project Manager:  Mary Harden

RFQ Curb and Gutter Glen Oak Park_9-17-20

 

Written quotes must be submitted by Thursday, October 1, 2020, at 2:00 p.m.  Quotes may be delivered, mailed, faxed, or e-mailed (mharden@peoriaparks.org) to the Planning Office in Bradley Park located at 1314 N. Park Road, Peoria, IL  61604.

No pre-quote meeting will be held, but all contractors must visit site before quoting.

Pavement Striping – Safety Town

Request for Quote: Pavement Striping – Safety Town

 

Project Manager:

Mike Friberg

Quotes due by 2:00 p.m. August 4, 2020

Pickleball Courts Re-Bid Glen Oak Park

Download Planholder List CSV

Project Manager: Mary Harden

ADDENDUM_1_Pickleball Courts REBID 19-015 GOP

 

Sealed bids will be received until Tuesday, August 4, 2020 at 1:15 pm prevailing time, by the Owner, and the Peoria Park District Administrative Office, 1125 W Lake Avenue, Peoria, IL.

A pre-bid meeting will be held at the site on Tuesday, July 28, 2020 at 11:00 am.

Backfill and Seeding – Chartwell Park Path

Request for Quote: Backfill and Seeding – Chartwell Park Path

Project Manager:

Mike Friberg

Addendum #1: Please use the revised quote form attached below. Assume 462.2 Cubic yards of topsoil needed.

Revised Quote Form

Please submit written quotes by Tuesday, July 28, 2020, at 2:00 p.m. Quotes may be emailed to
mfriberg@peoriaparks.org .

Utility Storage Building at Donovan Park

Download Planholder List CSV

Project Manager:  Becky Fredrickson

Addendum No. 1 Utility Storage Building Donovan Park

Addendum No. 2 Utility Storage Building Donovan Park

Sealed bids will be received until Tuesday, August 4, 2020 at 1:00 pm prevailing time, by the Owner, at the Peoria Park
District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614

A pre-bid meeting will be held at the site (access off of Northmoor Road across from former Midstate College) on
Tuesday, July 21, 2020 at 9:00am.

 

Asphalt Overlay – Rock Island Greenway

Download Planholder List CSV

Project Manager:

Mike Friberg

Sealed bids will be received until TUESDAY, JULY 14, 2020 at 1:30 P.M. prevailing time, by the Owner, at the Peoria
Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the intersection of Teton Ave. and the Rock Island Greenway on Tuesday July 7, at 9:00 a.m.

Roofing Project – Proctor Recreation Center

Download Planholder List CSV

Project Manager:

Becky Fredrickson

Addendum #1: Click HERE

Sealed bids will be received until Tuesday, June 30, 2020, at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park
District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

 

A pre-bid meeting will be held at the site on Tuesday, June 23, 2020 at 10:00am.

Pickleball Courts- Glen Oak Park

Download Planholder List CSV

Project Manager:

Mary Harden

 

ADDENDUM_1_Pickleball Courts 19-015 GOP

Sealed bids will be received until Tuesday, June 16, 2020 at 1:30 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave, Peoria, IL 61614.

 

A pre-bid meeting will be held at the project site on Tuesday, June 9, 2020 at 9:30 a.m.

2020 District-Wide chip and Seal

Download Planholder List CSV

Project Manager:

Mike Friberg

Sealed bids will be received until TUESDAY, JUNE 9, 2020 at 1:00 PM prevailing time, by the Owner, at the Peoria
Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Bradley Park North/Upper Curb and Gutter

Download Planholder List CSV

Project Manager: Mary Harden

Sealed bids will be received until Tuesday, June 2, 2020 at 1:30 p.m. prevailing time, by the Owner at the Peoria Park District Administrative Office, 1125 W. Lake Ave, Peoria, IL 61614.

A pre-bid meeting will be held at the site on Tuesday, May 26, 2020 at 9:30 a.m.

Underdrain at Rock Island Greenway Milepost 9.5

RFQ Underdrain

Project Manager: Mike Friberg

Quotes are due Tuesday May 19, 2020 at 2:00 p.m. by email only at mfriberg@peoriaparks.org.

There is no pre-quote meeting for this project.

Parking Lot Repair and Resurfacing – Proctor Recreation Center

RFQ PRC Parking Lot

Project Manager:

Mike Friberg

Due to work at home restrictions, if you have questions, please contact me on my cell: 309-648- Five Oh Five Seven.

Deadline:
Please submit written quotes by Thursday, May 14, 2020, at 2:00 p.m. Quotes may be emailed to
mfriberg@peoriaprks.org .

Asphalt Pavement Replacement at Safety Town

Download Planholder List CSV

Project Manager

Mike Friberg

Due to work at home restrictions, if you have questions, please contact me on my cell: 309-648- Five Oh Five Seven.

Sealed bids will be received until Tuesday, May 19, 2020 at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park
District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at Safety Town on Tuesday May 12, 2020 at 9 :00 a.m.

RFQ- Golf Learning Center Water Line Boring

RFQ GLC Boring

Project Manager:

Mike Friberg

For questions, please email mfriberg@peoriaparks.org or call 309-648- Five Oh Five Seven.

Deadline:
Please submit written quotes by Thursday, May 7, at 2:00 p.m. Quotes may be emailed to
(mfriberg@peoriaparks.org).

Asphalt Path Replacement – Franciscan Recreation Center

Download Planholder List CSV

Project Manager

Mike Friberg

Due to work at home restrictions, if you have questions, please contact me on my cell: 309-648- Five Oh Five Seven.

Sealed bids will be received until May 5, 2020 at 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at Franciscan Recreation Center on April 28, 2020, at 9 :00 a.m.

Asphalt Path Replacement-Rock Island Greenway – Atlantic to Allen

Download Planholder List CSV

Project Manager

Mike Friberg

Due to work at home restrictions, if you have questions, please contact me on my cell: 309-648- Five Oh Five Seven.

Sealed bids will be received until May 5, 2020 at 1:15 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at intersection of Alta Rd. And Atlantic St. on April 28, 2020 at 11 :00 a.m..

RFQ Flooring Removal & Replacement – Franciscan Recreation Center

***UPDATE: 4/8/2020:  The Park District is reopening this project. Quotes are due by 10:00 am on Friday, April 17, 2020.  Franciscan Rec Center will be open on Tuesday, April 14, 2020 from 11:00 am- 12:00pm for Contractors to view and measure the space. ***

 

**UPDATE: Due to Governor Pritzker’s recent order for Illinois to Shelter in Place through early April, the deadline to submit quotes for Flooring Removal and Replacement at Franciscan Recreation Center will be extended. When the District is able to resume normal operations, a new timeline will be posted here.**

 

RFQ – Flooring Removal and Replacement Franciscan Recreation Center

Project Manager: Mary Harden

The site will be open on Tuesday, April 14, 2020 from 11:00 am- 12:00 pm for Contractors to view the site.

Quotes are due on Friday, April 17, 2020 by 10:00 am. Please email all quotes to mharden@peoriaparks.org.

 

Written quotes must be submitted by Tuesday, March 24, 2020, at 2:00 p.m.  Quotes may be delivered, mailed, faxed, or e-mailed (mharden@peoriaparks.org) to the Planning Office in Bradley Park, located at 1314 N. Park Road, Peoria, IL  61604.

A pre-quote meeting will be held at the Franciscan Recreation Center at 908 N. Sterling Avenue, West Peoria, IL,  61604, on Wednesday, March 18, 2020, at 10:30 a.m.

Fabrication and Installation of Exterior Handrails – Proctor Center

 

RFQ PRC Handrails

Project Manager – Mike Friberg

Because this project will not exceed the bidding threshold, quotes may be submitted with no bid bond.

Please submit written quotes by Tuesday, March 17, 2020, at 2:00 p.m. Quotes may be delivered, mailed, faxed,
or emailed (mfriberg@peoriaparks.org) to the Planning Offices at the address above.

 

Concrete Steps Replacement – Trewyn Park Pavilion

Download Planholder List CSV

Project Manager: Mike Friberg

Sealed bids will be received until MARCH 17, 2020, AT 1:30 P.M. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at Trewyn Park Pavilion on March 10, 2020 at 9:00 a.m..

 

RFP Prairie Restoration

Download Planholder List CSV

Project Manager:  Becky Fredrickson

Sealed proposals will be received until 1:00 p.m., Tuesday, February 4, 2020, prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Avenue, Peoria, IL  61614.

A pre-proposal meeting will be held at Detweiller Riverside Park on Tuesday, January 28, 2020, at 1:00 p.m. at 8412 N. Galena Road.

RFQ Cork Flooring Forest Park Nature Center

RFQ FPNC Cork Flooring Entrance

Project Manager: Mary Harden

Written quotes must be submitted by Tuesday, January 21, 2020 by 2:30 p.m. Quotes may be delivered,  mailed, faxed or emailed (mharden@peoriaparks.org) to the Planning Office in Bradley Park, located at 1314 N Park Road, Peoria, IL 61604.

RFQ- 2″ HDPE Boring- Newman Golf Course

RFQ 2 HDPE Boring- Newman Golf Course

 

Project Manager: Mary Harden

Written quotes must be submitted by Thursday, October 17, 2019 at 2:00 p.m. Quotes may be delivered, mailed, faxed or emailed (mharden@peoriaparks.org) to the Planning Office in Bradley Park, located at 1314 N Park Road, Peoria, IL 61604.

 

 

Playground Resurfacing – Columbia Park

Download Planholder List CSV

Project Manager:  Mike Friberg

 

ColumbiaPlaygroundSurfacingADDENDUM1

ColumbiaPlaygroundSurfacingADDENDUM2

ColumbiaPlaygroundSurfacingADDENDUM3

Sealed bids will be received until 1:00 p.m., Tuesday, October 15, 2019, prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Avenue, Peoria, IL  61614.

A pre-bid meeting will be held at Columbia Park Playground on Tuesday, October 8, 2019, at 9:00 a.m. at 307 W. McClure Avenue.

Column Repair- Golf Learning Center

RFQ Column Repair Golf Learning Center

 

Project Manager: Mary Harden

Quotes are due by Tuesday, October 1, 2019 by 1:00 p.m. Quotes may be hand delivered, mailed, faxed or emailed.

 

There is no pre-quote meeting for this project but all Contractor’s must visit site before quoting.

Culvert Replacement – Chanute Road

Download Planholder List CSV

Project Manager:  Mike Friberg

Sealed bids will be received until 1:00 p.m., Tuesday, September 17, 2019 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

A pre-bid meeting will be held at the end of Chanute Road (near 1610 W. Chanute Rd. where it meets Mt. Hawley Airport property) on Monday, September 9, 2019 at 1:00 p.m.

Tennis Court Color Coating & Crack Repair- Sommer Park

Download Planholder List CSV

Project Manager: Mary Harden

Sealed bids will be received until 1:00 p.m., Tuesday, August 20, 2019 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

 

There is no pre-bid meeting for this project.

Roof Replacement Bradley Park- ESC Paint Shop

Download Planholder List CSV

Project Manager: Rebecca Fredrickson

 

Addendum 1_Bradley Park ESC Paint Shop Roof

Sealed bids will be received until 12:45 p.m. Tuesday August 6, 2019 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL 61614.

 

A pre-bid meeting will be held at Bradley Park Equipment Service Building on Wednesday, July 31, 2019 at 9:00 a.m.

Roof Replacement RiverPlex Pool

Download Planholder List CSV

Project Manager: Rebecca Fredrickson

 

Addendum 1_RiverPlex Pool Roof

Sealed bids will be received until 1:00 p.m., August 6, 2019 prevailing time by the Owner at the Peoria Park District Administrative Office, 1125 W. Lake Avenue, Peoria, IL 61614.

 

A pre-bid meeting will be held at the site on Tuesday, July 30, 2019 at 10:00 a.m.

Chiller Replacement- RiverPlex

Download Planholder List CSV

Project Manager: Rebecca Fredrickson

 

Addendum 1_RiverPlex Chiller Replacement

Addendum 2_ RiverPlex Chiller Replacement

 

Sealed bids will be received until 1:15 p.m. on August 6, 2019 prevailing time by the Owner at the Peoria Park District Administrative Office, 1125 W. Lake Avenue, Peoria, IL 61614.

A pre-bid meeting will be held on Tuesday, July 30, 2019 at 9:00 a.m. at the RiverPlex

Exterior Waterproofing- Lakeview Rec Center

RFQ Lakeview Rec Ext Waterproofing

Project Manager: Mary Harden

Quotes are due by 1:00 p.m. on Tuesday, July 16, 2019 to the Planning Office located in Bradley Park. Quotes may be hand delivered, mailed, faxed or emailed.

 

There is no pre-quote meeting scheduled.  However, as a children’s daycamp is actively happening at the site, please inform the Planning Division in advance of your visit in addition to checking in at the front desk of Lakeview Rec Center.

Stormwater Improvements – Grand View Drive @ Grandview Ave. and IL Route 29

Download Planholder List CSV

Project Manager:

Mike Friberg

A Pre-Bid meeting will be held on June 27, 2019 at 9:00 a.m.

Sealed bids will be received until TUESDAY, JULY 9, 2019 AT 1:00 P.M. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Curb & Gutter Improvements Laura Bradley Park

Download Planholder List CSV

Project Manager: Mary Harden

Sealed bids will be received until 1:30 p.m. on Tuesday, June 04, 2019 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.  (The Board Room clock shall be the official time keeping device in respect to the bid submission deadline.)

A pre-bid meeting will be held at the project site in Bradley Park on Tuesday, May 28, 2019 at 9 :30 a.m.

 

Asphalt Path Replacement – Chartwell Park

Download Planholder List CSV

Project Manager:

Mike Friberg

PRE-BID has been re-scheduled for Thursday, May 9, at 9:00 a.m. Sorry for the inconvenience!

Sealed bids will be received until Tuesday, May 14, 2019 at 12:45 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.  (The Board Room clock shall be the official time keeping device in respect to the bid submission deadline.)

A pre-bid meeting will be held at the Chartwell Road access (intersection of Chartwell Road and Parkwood Drive) to Chartwell Park  on Tuesday, May 7, 2019 at 9:00 a.m.

Park District Used Equipment Sale

 

Used Equipment Sale 2019

Project Manager:

Becky Fredrickson

Sealed bids will be received until 1:00 p.m., Tuesday, May 14, 2019, prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.  (The Board Room clock shall be the official time keeping device in respect to the bid submission deadline.)

Ramp Handrail – Cyd’s in Donovan Park

HandrailRFQ

Project Manager:

Mike Friberg

Please submit written quotes by Friday, April 12, 2019 at 2:00 p.m. Quotes may be delivered, mailed, faxed, or emailed (mfriberg@peoriaparks.org) to the Planning Offices at the address above.

 

Lease of Training Room Lakeview Recreation Center

Download Planholder List CSV

Project Manager:

Becky Fredrickson

Sealed Proposals will be received until 10:00 a.m., Tuesday, April 9, 2019, prevailing time, by the Owner at the Park District Administrative Office, 1125 W. Lake Avenue, Peoria, IL 61614.

Golf Course Storage Buildings – Newman and Kellogg Golf Courses

Download Planholder List CSV

Project Manager:

Becky Fredrickson

Addenda 1 Combined

A pre-bid meeting will be held at Newman Golf Course on Tuesday, March 26, 2019 at 1 :00 p.m..

Sealed bids will be received until 1:15 p.m., Tuesday, April 2, 2019 prevailing time, by the Owner, at the Peoria Park
District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614. (The Board Room clock shall be the official
time keeping device in respect to the bid submission deadline.)

Pool Heat Exchangers – Riverplex Recreation and Wellness Center

Download Planholder List CSV

Project Manager:

Becky Fredrickson

 

Addendum No. 2 RiverPlex Pool Heat Exchangers

 

Addendum No. 1 RiverPlex Pool Heat Exchangers

A pre-bid meeting will be held at the RiverPlex on Tuesday, March 26, 2019 at 10 :00a.m.

Sealed bids will be received until 1:00 p.m., Tuesday, April 2, 2019 prevailing time, by the Owner, at the Peoria Park
District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614. (The Board Room clock shall be the official
time keeping device in respect to the bid submission deadline.)

Lion Overlook – Peoria Zoo

Download Planholder List CSV

Project Manager:

Becky Fredrickson

 

ADDENDUM1_LION OVERLOOK

A pre-bid meeting will be held at the site on Tuesday, October 23, 2018 at 10:00 a.m. Please meet at the front entrance of the zoo.

Sealed bids will be received until 1:15 p.m. Tuesday, October 30, 2018, prevailing time at the Peoria Park District Administrative Office, 1125 W. Lake Avenue, Peoria, IL 61614.

Tawny Oaks Barn Roof

Download Planholder List CSV

 

TawnyOaksBarnRoofAddendum1

Project Manager:

Mike Friberg

A pre-bid meeting will be held at Tawny Oaks Field Station on Tuesday, October 23, 2018 at 9 :00 a.m.

Sealed bids will be received until Tuesday, October 30, 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Camp Wokanda Dining Hall Kitchen CMU Foamed-in-Place Insulation

Project Manager:

Mary Harden

 

RFQ Camp Wokanda Dining Hall Kitchen Foamed in Place Insulation

A pre-quote meeting will be held at the site on Tuesday, October 16, 2018 at 1:30 p.m. Please meet at the lower parking lot.

 

Quotes are due by 1:30 pm on Tuesday, October 23, 2018 at the Planning, Design and Construction Division Office located in Bradley Park. Quotes can be faxed (309-686-3383) emailed to mharden@peoriaparks.org or hand delivered to 1314 N. Park Road, Peoria, IL.

ACCU Replacement at Lakeview Recreation Center

Download Planholder List CSV

LakeviewACCU-ADDENDUM1

 

Project Manager:

Mike Friberg

A pre-bid meeting will be held at Lakeview Recreation Center on Tuesday, October 16, 2018 at 9 :00 a.m.

Sealed bids will be received until Tuesday, October 23, 1:00 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Door Replacement and Repair- Owens Ice Center

Project Manager:

Mary Harden

 

Owens Door RFQ_10_02_2018

 

ADDENDUM ONE Owens Doors 10.09.2018

A pre-quote meeting will be held at the site on Tuesday, October 9, 2018. Please meet in front of the main entrance.

 

Quotes are due by 1:30 pm on Tuesday, October 16, 2018 at the Planning, Design and Construction Division Office located in Bradley Park. Quotes can be faxed (309-686-3383) emailed to mharden@peoriaparks.org or hand delivered to 1314 N. Park Road, Peoria, IL.

Roof Replacement – Forest Park Nature Center Bird Wing

Download Planholder List CSV

Project Manager:

Mike Friberg

 

Click below for Addendum #1

FPNCRoofADDENDUM1

Sealed bids will be received until Tuesday, October 9, 2018 at 1:00 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

There is a pre-bid meeting scheduled for Wednesday, October 3, 2018 at 9:00 a.m. at Forest Park Nature Center.

District-Wide Sealcoating 2018

Download Planholder List CSV

Project Manager:

Mike Friberg

Sealed bids will be received until September 4, 2018 at 1:00 P.M. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614

 

There is no pre-bid meeting scheduled for this project. Please call or email with questions.

Pool Prep and Painting- Gwynn Family Aquatic Center

Download Planholder List CSV

Project Manager:

Rebecca Fredrickson

ADDENDUM1_Gwynn Pool Paint

A pre-bid meeting will be held at the site on Wednesday, August 8, 2018 at 1:00 p.m.

 

Sealed bids will be received by the Owner until 1:15p.m. on Tuesday, August 14, 2018 at the Park District Administrative Office, 1125 W Lake Avenue.

 

Tennis Court Crack Repair and Color Coating

Download Planholder List CSV

Project Manager:

Mary Harden

A pre-bid meeting will be held at the site on Monday, August 6, 2018 at 10:30 a.m.

Sealed bids will be received until 1:00 p.m. on Tuesday, August 14, 2018  by the Owner at the Park District Administrative Office, 1125 W. Lake Avenue, Peoria, IL.

Natatorium Curtain Wall Painting

Download Planholder List CSV

Project Manager:

Mary Harden

Addendum #1:

ADDENDUM 1 Natatorium Curtain Wall

A pre-bid meeting will be held at the site on Tuesday, July 24, 2018 at 9:30 a.m.

Sealed bids will be received until July 31, 2018, 1:15 p.m. prevailing time by the Owner at the Park District Administrative Office, 1125 W Lake Ave., Peoria, IL.

Rotary Trailhead at Donovan Park

Download Planholder List CSV

Project Manager:

Mike Friberg

 

Addendum #1:

RotaryTrailheadADD1

Addendum #2:

Rotary TrailheadAdd2

A pre-bid meeting will be held at the Donovan Park parking lot at 9:00 a.m. on Tuesday, July 24, 2018.

Sealed bids will be received until July 31, 2018 1:00 P.M. prevailing time, by the Owner, at the Peoria Park District
Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

RFQ- Carpet Replacement Owens Recreation Center

Project Manager: Mary Harden

 

RFQ Owens Rec Center Carpet Replacement07-12-2018

Quotes are due by 1:30 p.m. on Thursday, July 26, 2018 at the Planning, Design and Construction Division office located in Bradley Park.  Quotes can be faxed to (309) 686-3383, emailed to mharden@peoriaparks.org or hand delivered to 1314 N. Park Road, Peoria, IL 61604

Natatorium Painting – RiverPlex Recreation and Wellness Center

Download Planholder List CSV

Project Manager:  Mary Harden

 

Natatorium Painting Addendum #1

A pre-bid meeting will be held at the RiverPlex on Tuesday, June 19, 2018 at 9:30 am.

Sealed bids will be received until 1:30 pm, Thursday, June 28, 2018 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.  (The Board Room clock shall be the official time keeping device in respect to the bid submission deadline.)

Front Desk and Hallway Finishes – Lakeview Recreation Center

Download Planholder List CSV

Project Manager –  Mike Friberg

A pre-bid meeting will be held at the site on Tuesday, June 12, 2018 at 9:00 a.m.

Sealed bids will be received until Tuesday, June 19, 2018 at 1 P.M. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.  (The Board Room clock shall be the official time keeping device in respect to the bid submission deadline.)

Site Redevelopment Knoxville Ave. and Northmoor Rd. Request for Proposals

Download Planholder List CSV

Project Manager: Becky Fredrickson

Sealed Proposals will be received until 2:00pm, Tuesday, July 10, 2018, prevailing time, by the Owner, at the Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614 for the proposed redevelopment of Park District land at Knoxville Ave. and Northmoor Rd. (former IDOT District 4 headquarters campus).

Roof Replacement – Donovan Park Clubhouse – Upper Roof

Download Planholder List CSV

 

Project Manager:  Rebecca Fredrickson

ADDENDUM ONE-Donovan Roof

A pre-bid meeting will be held at site on Tuesday, April 10, 2018, at 10:00 AM.

Sealed bids will be received until Tuesday, April 17, 2018, 1:00 PM prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.  (The Board Room clock shall be the official time keeping device in respect to the bid submission deadline.)

Peoria Zoo – Petting Zoo Fencing

RFQ Petting Zoo Fencing

Project Manager:  Mike Friberg

Contractor is responsible for verifying all existing conditions and measurements. The project site can be viewed during normal business hours.
Please contact Yvonne Strode (309-681-3509) or Kim Scott (309-681-3524) to arrange visits.

Please submit written quotes by Friday, April 6, 2018 at 2:00 p.m.  Quotes may be delivered, mailed, faxed, or emailed

Email: mfriberg@peoriaparks.org

Fax: 309.686.3383

Mail/Deliver:
Planning Office
1314 N. Park Road
Peoria, IL 61604

Golf Learning Center – Carpet Removal and Replacement

GLC CarpetRFQ

Project Manager: Mary Harden

A pre-quote meeting will be held at the site on Tuesday, March 13, 2018 at 2:00p.m.

Please submit written quotes by Tuesday, March 20, 2018, at 2:00 p.m.. Quotes may be delivered, mailed, faxed, or emailed to the Planning Offices, see below.

Planning, Design and Construction Division
Attn:  Mary Harden
1314 N. Park Road
Peoria, IL 61604

Fax (309) 686-3383

mharden@peoriaparks.org

RFQ Mark Woodlands Park Backstops and Fencing

RFQ MarkWoodlands Fencing

Project Manager:  Mary Harden

A pre-quote meeting will be held at the site on Tuesday, February 13, 2018 at 9:30 am.

Please submit written quotes by Tuesday, February 20, 2018 at 1:30 pm.  Quotes may be delivered, mailed, faxed or emailed to the Planning Office, Attn:  Mary Harden.

Email: mharden@peoriaparks.org

Fax: 309.686.3383

Mail/Deliver:
Planning Office
1314 N. Park Road
Peoria, IL 61604

RFQ-HISRA – Carpet Replacement

RFQ HISRA Carpet

Project Manager:  Mary Harden

A pre-quote meeting will be held at the site on Wednesday, January 31, 2018 at 9:30 am.

Please submit written quotes by Tuesday, February 6, 2018 at 2:00 pm.  Quotes may be delivered, mailed, faxed or emailed to the Planning Office, Attn:  Mary Harden.

Email: mharden@peoriaparks.org

Fax: 309.686.3383

Mail/Deliver:
Planning Office
1314 N. Park Road
Peoria, IL 61604

New Restroom and Site Work – W. H. Sommer Park

Download Planholder List CSV

Project Manager:    Mike Friberg

SommerRestroomAddendum 1

SommerRestroomAddendum2

A pre-bid meeting will be held at the Project Site at 6329 N. Koerner Road, Edwards, Illinois on November 17, 2017 at 9:00 a.m.

Sealed bids will be received until NOVEMBER 28, 2017 at 1:30 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.  (The Board Room clock shall be the official time keeping device in respect to the bid submission deadline.)

Exterior Staining – Golf Learning Center

Download Planholder List CSV

Project Manager:

Mary Harden

Addendum 1 GLC Exterior Staining

A pre-bid meeting will be held at the site on Tuesday, September 26, 2017 at 10 :00 a.m.

Sealed bids will be received until 1:15 p.m. on October 4, 2017 prevailing time, by the Owner, at the Peoria Park District
Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614. (The Board Room clock shall be the official time
keeping device in respect to the bid submission deadline.)

Paved Trail Connection – Donovan Park

Download Planholder List CSV

Project Manager:

Mike Friberg

 

Click  for ADDENDUM ONE DonovanTrailConnection

Extends bidding by one day to October 4th.

A pre-bid meeting will be held at Donovan Park on Tuesday September 26, 2017 at 1:00 p.m.

Sealed bids will be received until Wednesday, October 4, 2017 at 1:00 prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Tennis Court Perimeter Fence Improvement – Northtrail Park

Download Planholder List CSV

Project Manager

Mary Harden

 

 

 

A pre-bid meeting will be held at Northtrail Park on Thursday, September 21, 2017 at 9 :30 a.m.

Sealed bids will be received until September 28, 2017 at 10:30 a.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.  (The Board Room clock shall be the official time keeping device in respect to the bid submission deadline.)

Lakeview Recreation Center Renovation

Download Planholder List CSV

Project Manager:

Mike Friberg

For Addendum #1, click here ——> 2014909.01 Lakeview Addendum 001

For Addendum #2, click here ——> 00202 Addendum No. 2

For Addendum #3, click here ——-> 00203 Addendum No. 3

Pre-Bid Meeting: At the Lakeview Recreation Center on Tuesday, September 26, 2017 at 9:00 a.m.

 

Sealed bids will be received until Thursday, October 12, 2017 at 1:30 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Aviary Curtain Wall Replacement

Download Planholder List CSV

Project Manager:

Mary Harden

Addendum 1 Aviary Curtain Wall

Addendum 2 Aviary Curtain Wall

Pre-bid Meeting: Wednesday, August 30, 2017 at 1:30p.m. Please meet at the main entrance of the Peoria Zoo.

Bids due: Tuesday, September 12, 2017 by 3:00 p.m. at the Noble Center located at 1125 W. Lake Avenue, Peoria, IL.

District-wide Sealcoating 2017

Download Planholder List CSV

Project Manager:

Mike Friberg

Bidders, by submission of their Bids, represent that they have visited the site to acquaint themselves with the local conditions in which the Work is to occur, and that they are familiar with all the requirements of the Project, as defined in the Project Manual and the Plan(s).

Sealed bids will be received until August 30, 2017 at 1:30 p.m. prevailing time, by the Owner, at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.

Perimeter Fence Replacement – Peoria Zoo

Download Planholder List CSV

Project Manager: Becky Fredrickson

Pre-bid Meeting: Tuesday, August 8, 2017 at 10:00 a.m. Please meet at the Zoo’s main entrance.

Bids due: Tuesday, August 15, 2017 by 1:00 p.m. at the Noble Center located at 1125 W. Lake Avenue, Peoria, IL.

RFQ – Luthy Botanical Garden – Facade Improvements

RFQ Package- Luthy Facade

Project Manager:  Mary Harden

A pre-quote meeting will be held at the Botanical Garden on Tuesday, July 18, 2017 at 9:30 a.m.

Please submit written quotes by Tuesday, July 25, 2017, 2:00 PM.  Quotes may be delivered, mailed, faxed or emailed to the Planning Office, Attn:  Mary Harden.

Email: mharden@peoriaparks.org

Fax: 309.686.3386

Mail/Deliver:
Planning Office
1314 N. Park Road
Peoria, IL 61604

RiverPlex Recreation and Wellness Center Boiler Replacement Ph. 2

Download Planholder List CSV

Project Manager:  Becky Frederickson

A pre-bid meeting will be held at The RiverPlex Recreation & Wellness Center, 600 N.W. Water St., Peoria, Illinois on Tuesday, June 20, 2017 at 10 :00 a.m.

Sealed bids will be received until Tuesday, June 27, 2017 @ 1:00 p.m.  at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, Illinois 61614.  (The Board Room clock shall be the official time keeping device in respect to the bid submission deadline.)

RFQ – Biefeldt Park – Shelter Roof Replacements

RFQ Bielfedldt Park Shelter Roof Replacements 17-001

Project Manager:  Mary Harden

Please submit written quotes by Tuesday, June 20 2017, 2:00 PM.  Quotes may be delivered, mailed, faxed or emailed to the Planning Office.

Email: mharden@peoriaparks.org

Fax: 309.686.3386

Mail/Deliver:
Planning Office
1314 N. Park Road
Peoria, IL 61604

Camp Wokanda Dining Hall Roof Replacement

Download Planholder List CSV

Project Manager: Mary Harden

Please click here for  ADDENDUM 1 Camp Wok

A pre-bid meeting will be held at the site on Tuesday, May 23, 2017 at 9:00 a.m. Please meet in the lower parking lot.

Bids are due by Thursday, June 1, 2017 at 1:30p.m. at the Peoria Park District Administrative Office, 1125 W. Lake Avenue, Peoria, IL 61614.

Trewyn Park Pavilion – Roof Replacement

Download Planholder List CSV

Project Manager:  Mike Friberg

mfriberg@peoriaparks.org

For Addendum #1, click TrewynRoofAddendum 1

A pre-bid meeting will be held at the project site on Monday April 24, 2017 at 1:00 p.m.

Sealed bids will be received by the Owner until Tuesday, May 2, 2017 at 2:00 p.m.

Peoria Park District Administrative Offices
1125 W. Lake Avenue
Peoria, IL 61614

W.H. Sommer Park – Restroom Building Package

Download Planholder List CSV

Project Manager:  Mike Friberg

mfriberg@peoriaparks.org

 

 

 

Sealed bids will be received by the Owner until Tuesday, April 25, 2017 at 1:00 p.m.

Peoria Park District Administrative Office
1125 W. Lake Avenue
Peoria, IL 61614

RFQ Telescoping Bleachers – Lakeview Recreation Center

LakeviewRecBleachers

Project Manager:  Mike Friberg

Please submit written quotes by Friday, April 14, 2017, 2:00 PM.  Quotes may be delivered, mailed, faxed or emailed to the Planning Office.

Email: mfriberg@peoriaparks.org

Fax: 309.686.3386

Mail/Deliver:

Planning Office
1314 N. Park Road
Peoria, IL 61604

RFQ – Newman Golf Course – Starter Shed

Newman Starter Shed RFQ

Project Manager:  Becky Fredrickson

Please submit written quotes by Wednesday, April 5, 2017, at 2:00 PM.  Quotes may be delivered, mailed, faxed or e-mailed.  See below:

E-Mail:    rfredrickson@peoriaparks.org

Fax:   309-686-3383

Mail:
Planning Office
1314 N. Park Road
Peoria, IL 61604

RFQ- Golf Maintenance Operations- Maintenance Shop Relighting

RFQ_3-21-2017_GolfMaintRelight

Project Manager: Mary Harden

A pre-quote meeting will be held on Tuesday, March 28, 2017 at the Golf Maintenance Shop. Please see RFQ for address.

Submit quotes by 2:00 p.m. on Tuesday, April 4, 2017 via one of the following:

Email: mharden@peoriaparks.org

Fax: 309.686.3386Mail/Deliver:

Planning Office     1314 N. Park Road     Peoria, IL 61604

 

 

Electrical Wiring for Basketball Winches – Lakeview Recreation Center

LakeviewRecElectric RFQ

Project Manager :  Mike Friberg

 

Submit quotes by Friday, March 24, 2017 at 2:00 pm via one of the following:

E-Mail:    mfriberg@peoriaparks.org

Fax:   309-686-3383

Mail:
Planning Office
1314 N. Park Road
Peoria, IL 61604

Lakeview Recreation Electric Basketball Winches

Basketball Electric Winches RFQ

Addendum #1

Project Manager:  Mike Friberg

Please submit written quotes by Friday, March 10, 2017 at 2:00 p.m. Quotes may be delivered, mailed, faxed, or emailed (mfriberg@peoriaparks.org) to the Planning Offices.

Planning, Design, and Construction, 1314 N. Park Road, Peoria, IL 61604

Fax:  309/686-3383

mfriberg@peoriaparks.org

Asbestos Abatement- Camp Wokanda Dining Hall Kitchen

RFQ- Asbestos Abatement Camp Wokanda Dining Hall Kitchen

Camp Wokanda Asbestos abatement RFQ2142017

 

Project Manager: Mary Harden

A pre-quote meeting will be held on Thursday, February 23, 2017 at 1:30 p.m. at the site.

Quotes are due no later than Tuesday, February 28, 2017. Quotes  may be emailed, faxed or hand delivered.

RiverPlex Glycol RFQ

Request for Proposals- RiverPlex Glycol Replacement

Project Manager: Mary Harden

RiverPlex Glycol RFP

 

 

A pre-proposal meeting is scheduled for Tuesday, January 24, 2017 at 10:30 a.m. at the RiverPlex.  It is strongly recommended that interested Contractors visit the site prior to submitting proposals.

Proposals are due no later than 1:30 p.m. on Tuesday, January 31, 2017 at the Noble Center/Peoria Park District Administrative Offices located at 1125 W. Lake Avenue, Peoria, IL 61614.

Maintenance Painting Services

Download Planholder List CSV

Request for Proposals – Maintenance Painting Services

Project Manager:

Nicole Staley

309-681-2921 phone

nstaley@peoriaparks.org

Proposals due Thursday January 26, 2017 at 10:00 a.m. at the Noble Center Park District Administration Building in Lakeview Park.

 

Bike Trail Tunnel Lights under Route 6

RFQ – Bike Trail Tunnel Lights under Route 6

tunnel-lights-rfq

Project Manager:

Mike Friberg

Quotes due 2:00 Friday December 9, 2016

Leisure Pool Deck Grate Replacement RiverPlex

RFQ- Leisure Pool Deck Grate Replacement- RiverPlex Recreation and Wellness Center

rfq-leisure-pool-grates

A pre-quote meeting will be held on Tuesday, November 1, 2016 at 11:00 a.m. Please meet inside the main entrance of the RiverPlex.

 

Quotes are due by Tuesday, November 8, 2016 by 2:00 p.m at the Planning, Design and Construction Division located in Bradley Park. Quotes can be faxed, emailed to mharden@peoriaparks.org or hand delivered to the Planning Offices.

Sidewalk and Steps – Glen Oak Park

Download Planholder List CSV

Project Manager:

Mike Friberg

A pre-bid meeting will be held at the project site on Tuesday, October 25 at 1:00 p.m.

Bids will be opened on Tuesday November 1, 2016 at 1:30 p.m. at the Peoria Park District administrative office at 1125 W. Lake Ave. in Peoria.

Carpet Removal & Replacement Riverplex

Download Planholder List CSV

Project Manager: Mary Harden

Carpet Removal & Replacement Phase I Riverplex Recreation and Wellness Center

 

Addendum-1-carpet-removal-replacement-riverplex

 

addendum-2-riverplex-carpet

Pre-bid Meeting: Tuesday, October 11, 2016 at 10:30 am. Please meet inside the main entrance of the Riverplex.

Bid open: Tuesday, October 18, 2016 @ 1:30p.m. at the Peoria Park District Administrative Office, 1125 W. Lake, Peoria, IL.

Gwynn Pk Habidek Roof Modification/Replace

gwynn-habideck-roof-rfq

Quotes are due by Tuesday, October 4, 2016 @ 2:00 p.m.

Erosion Repair – Forest Park Nature Center @ High Point Terrace

Download Planholder List CSV

Project Manager:  Becky Fredrickson

For Erosion Repair – Forest Park Nature Center @ High Point – Addendum One, click here:

addendum-1

Pre-Bid:  Monday, September 26, 2016 @ 1:00 p.m. at the site off of High Point Terrace (near 776 High Point Terrace).

Bid Open:  Tuesday, October 4, 2016 @ 1:30 p.m. at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL.

Roof Access Hatch and Improvements – Proctor Recreation Center

Download Planholder List CSV

Project Manager:  Becky Fredrickson

Pre-Bid:  Tuesday, September 27, 2016 @ 1:00 at Proctor Recreation Center.

Bid Open:  Tuesday, October 4, 2016 @ 1:15 p.m. at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL.

Boiler Replacement – RiverPlex Recreation & Wellness Center

Download Planholder List CSV

Project Manager:  Becky Fredrickson

For Addendum One, click here

addendum-1

Pre-Bid Meeting:  Tuesday, September 27, 2016 @ 10:30 at the RiverPlex Recreation & Wellness Center.

Bid Open:  Tuesday, October 4, 2016 @ 1:00 p.m. at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL.

Riverplex Recreation and Wellness Center Fire Hydrant Replacement

Riverplex Hydrant Replacement RFQ

Quotes are due by Friday, August 26, 2016 at 2:00 p.m.

 

Barn and Cabin Roof Replacement – W.H. Sommer Park

Download Planholder List CSV

 

Project Manager:  Mike Friberg

For Addendum One, click here:

ADDENDUM ONE Sommer Park Barn Cabin Roof

Pre-bid meeting will be held at W.H. Sommer Park on Tuesday, August 9, 2016 @ 1:00 p.m.

Bids are due @ 1:30 p.m., Tuesday, August 16, 2016 at the Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL

 

 

 

RFQ – Laura Bradley Park – Curb & Gutter Installation

RFQ 07262016

Quotes are due on Tuesday, August 9, 2016 by 2:00 P.M.

Pre-Quote meeting will be held at 10:30 a.m. on Tuesday, August 2, 2016 at the site.

Parking Lot – Rocky Glen Park

Download Planholder List CSV

Project Manager:  Becky Fredrickson

For Addendum #1 click here:ADDENDUM ONE

 

A pre-bid meeting will be held at the site on Tuesday, July 19, 2016 @ 10:00 a.m.

Bids are due Tuesday, July 26, 2016 @ 1:30 p.m. at Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL

RFQ Bradley Park Tennis Courts Pavement Repair

BradleyTennisRepairRFQ

Quotes are due by 2:00 p.m. Friday, July 14, 2016.

 

RFQ – Luthy Botanical Garden – Façade Improvements

Download Planholder List CSV

Project Manager:  Mary Harden

Quotes are due Tuesday, July 5, 2016 by 2:00 p.m.

A pre-quote meeting will be held at the site Tuesday, June 28, 2016 at 10:00 a.m.

 

Charter Oak Tennis Court Renovation

Download Planholder List CSV

Project Manager:  Mary Harden

A pre-bid meeting will be held at the site on Tuesday, June 21, 2016 @ 10:00 a.m.

Bids are due Tuesday, June 28, 2016 @ 1:00 p.m. at Peoria Park District Administrative Office, 1125 W. Lake Ave., Peoria, IL

Bradley Park Japanese Pagoda Roof Replacement

16-033JapanesePagodaRoofRFQBradley Park – Japanese Pagoda Roof Replacement

Quotes are due on Tuesday, June 14, 2016 by 2:00 p.m. Quotes can be hand delivered, mailed, emailed (mharden@peoriaparks.org), or faxed to the Planning Offices at 1314 N. Park Road, Peoria, IL.

 

Stormwater Improvements – Grand View Drive @ Bishop Ave. and IL Route 29

Download Planholder List CSV

Project Manager:  Mike Friberg

For Addendum #1, click here: Addendum #1

A Pre-Bid meeting will be held at Grand View Park (at the top of Grand View Drive Hill) on Tuesday, May 24, 2016 at 9:00 a.m.

Bids are due Tuesday, May 31, 2016 at 1:30 p.m. at the Peoria Park District Administrative offices at 1125 West Lake Ave.

*The Bidding period has been extended by one week.  Bids are now due on Tuesday, June 7, 2016 at 9:00 a.m.

 

Trewyn Park Pavilion Roof Replacement

Download Planholder List CSV

Project Manager:  Mike Friberg

For Addendum #1, click here: Addendum #1

For Addendum #2, click here:  TrewynAdd2

 

 

A Pre-Bid meeting will be held at the site on Tuesday, May 24, 2016 at 1:00 p.m.

Bids are due Tuesday, May 31, 2016 at 2:00 p.m. at the Peoria Park District Administrative offices at 1125 West Lake Ave.

*Bids are now due Tuesday, June 7, 2016 at 9:30 a.m.

District Wide Sealcoating

Download Planholder List CSV

For Addendum #1, click here: 2016SealcoatAddendum #1

Project Manager:

Mike Friberg

A Pre-Bid meeting will be held at Bradley Park near Cornstock Theatre on Tuesday, May 24, 2016 at 11:00 a.m.

Bids are due Tuesday, May 31, 2016 at 2:15 p.m. at the Peoria Park District Administrative offices at 1125 West Lake Ave.

Steel Plate Beam Guardrail – Detweiller Drive

Request for Quotes: Steel Plate Beam Guardrail – Detweiller Drive

 

Steel Plate Beam Guardrail – Detweiller Drive

Quotes are due on Friday, May 13, 2016 by 2:00 p.m. Quotes can be hand delivered, mailed, emailed (mfriberg@peoriaparks.org), or faxed to the Planning Offices at 1314 N. Park Road, Peoria, IL.

Robinson Park Bridge Erosion Protection

Download Planholder List CSV

Project Manager:

Mike Friberg

For Addendum #1, Please click HERE

A Pre-Bid meeting will be held at the site on Tuesday, April 26, 2016 at 9:00 a.m.

Bids are due Tuesday, May 3, 2016 at 1:30 p.m. at the Peoria Park District Administrative offices at 1125 West Lake Ave.

Drainage and Forward Tee Renovations – Newman Golf Course

Download Planholder List CSV

For Addendum 2, click ADDENDUM TWO_Newman Drainage Tees

For Addendum 1, click ADDENDUM ONE_Newman Drainage Tees

 

 

Project Manager:

Becky Fredrickson

A Pre-Bid meeting will be held at the site on Tuesday, March 29, 2016 at 10:00 a.m.

Bids are due Tuesday, April 5, 2016 at 1:30 p.m. at the Peoria Park District Administrative offices at 1125 West Lake Ave.

Proctor Recreation Center – Boys’ Gym Floor Refinish

Request for Quotes: Boys’ Gym Floor Refinish- Proctor Recreation Center

ProctorBoysGymFloorRefinish_RFQ

 

Quotes must be delivered by Thursday, March 31, 2016 at 2:00 p.m. Quotes can be hand delivered, mailed, faxed or emailed (refredrickson@peoriaparks.org) to the Planning Offices at 1314 N. Park Road, Peoria, IL.

Glen Oak Park Curb and Gutter

Request for Quotes: Curb and Gutter in Glen Oak Park

 

RFQ 1262016

 

 

A pre-quote meeting will be held on Tuesday, February 2, 2016 at 10:30 a.m.

Quotes are due on Tuesday, February 9, 2016 by 2:00 p.m. Quotes can be hand delivered, mailed, emailed (mharden@peoriaparks.org), or faxed to the Planning Offices at 1314 N. Park Road, Peoria, IL.

Forest Park Nature Center Cork Flooring

Request for Quotes: Cork Flooring at Forest Park Nature Center

FPNC Cork Flooring RFQ

Quotes are due on or before December 8, 2015 by 2:30 p.m. Quotes can be hand delivered, mailed, emailed (mharden@peoriaparks.org) or faxed to the Planning Offices at 1314 N. Park Road, Peoria, IL.

Lease of Clubhouse Building in Donovan Park

Download Planholder List CSV

Project Manager:

Becky Fredrickson

Proposals are due no later than 2:00 p.m,  Tuesday, January 19, 2016.  Proposals shall be delivered in a clearly marked envelope to the Noble Center /Peoria Park District Administrative Office located at 1125 W. Lake Ave., Peoria, IL 61614.

Peoria Zoo Takin Enclosure

Download Planholder List CSV

For Addendum #1, click  TakinBarnAddendum1

For Addendum #2, click TakinBarnAddendum 2

Project Manager:

Becky Fredrickson

A pre-bid meeting will be held on November 3, 2015 at 10:00 a.m. Please meet at the Peoria Zoo main entrance.

Bids are due on Tuesday, November 24, 2015 at 1:30 p.m. at the Park District Administrative Office located at 1125 W. Lake, Peoria, IL.

 

Colobus Window Replacement – Peoria Zoo

Request for Quotes: Colobus Window Replacement

RFQ Colobus Window Replacement 2015

Quotes are due on or before Tuesday, October 6 at 2:00 p.m.. Quotes can be hand delivered, mailed, emailed (mharden@peoriaparks.org), or faxed to the Planning Offices at 1314 N. Park Road, Peoria, IL.

Riverplex Parapet Ladder

Request for Quotes: Riverplex Parapet Ladder

Parapet Ladder RFQ

Quotes are due on Thursday, October 8, 2015 by 2:30 pm. Quotes may be emailed (mharden@peoriaparks.org), faxed or hand delivered to the Planning Offices at 1314 N. Park Road, Peoria, IL.

HISRA Canopy Repair

Request for Quotes: HISRA Canopy Repair

For RFQ documents, please click HERE

Please submit written quotes by Tuesday, September 29, 2015 at 2:30 p.m. Quotes may be delivered, mailed, faxed or emailed (rfredrickson@peoriaparks.org) to the Planning Offices.

Request for Quotes: Kinsey Memorial Roof Repairs located in Glen Oak Park.

 

For RFQ documents, please click HERE.

Please submit written quotes by Tuesday, September 15, 2015 at 2:30 p.m. Quotes may be delivered, mailed, faxed or emailed (mharden@peoriaparks.org) to the Planning Offices.

Bridge Erosion Repair – Camp Wokanda

Download Planholder List CSV

Project Manager:

Mike Friberg

A Pre-Bid meeting will be held at the Camp Wokanda parking lot on Tuesday, September 1, 2015 at 9:30 a.m.

Bids are due Tuesday, September 8, 2015 at 1:30 p.m. at the Peoria Park District Administrtive offices at 1125 West Lake Ave.

Detweiller Park Erosion Control

Download Planholder List CSV

Project Manager:

Michael Friberg

A pre-bid meeting will be held at the project site on Tuesday, August 11, 2015 at 10:00 a.m.

Bids are due Tuesday, August 18, 2015 at 1:30 p.m. at the Peoria Park District Administrative Offices located at 1125 W. Lake Avenue, Peoria, IL

Owens Recreation Center Restroom Renovation

Download Planholder List CSV

Project Manager:

Mary Harden

 

For Addendum 1, click HERE.

A pre-bid meeting will be held at the site on Tuesday, June 30, 2015 at 10:00 a.m.

Bids are due by 1:30 p.m. on Wednesday, July 8, 2015 at the Peoria Park District Administrative Offices located at 1125 W. Lake Avenue, Peoria, IL.

Request for Quotes: Lighting Materials for Luthy Botanical Garden

 

For RFQ documents, click HERE.

Please submit written quotes by Friday, June 26, 2015 at 2:30 p.m.. Quotes may be delivered, mailed, faxed or email to the Planning Office located in Bradley Park.

Waterslide Support Structure and Foundation Removal

Download Planholder List CSV

Project Manager:

Mike Friberg

A pre-bid meeting will be held at Lakeview Family Aquatic Center on June 16, 2015 at 11:00a.m.

Bids are due by 1:30 p.m. on Tuesday, June 23, 2015 at the Peoria Park District Administrative Offices located at 1125 W. Lake Avenue, Peoria, IL.

 

Request for Quotes: Concrete Foundation and Flatwork 

Camp Wokanda Apache Cabin

For RFQ Documents, click HERE

Please submit written quotes by Friday April 3 at 2:00 p.m. Quotes may be delivered, mailed, faxed, or emailed to the Planning Offices.

Attingham PArk Neighborhood Trail Connection

Download Planholder List CSV

Project Manager:

Mike Friberg

A pre-bid meeting will be held at the site on Tuesday March 24, at 9:30 a.m.

Bids are due Tuesday March 31, 2015 at 1:30 p.m.

RFQ Old Zoo Entry Building Fence

Download Planholder List CSV

Project Manager:

Zach Terry

Quotes are due Thursday, February 19, 2015 by 2:00 p.m.  Quotes may be hand delivered, mailed, faxed, or emailed (zterry@peoriaparks.org) to the Planning Office located in Bradley Park.

Riverplex Pool Drop Ceiling

Download Planholder List CSV

Project Manager:

Zach Terry

Please submit written quotes by Tuesday, March 10, 2015 at 2:00 p.m. Quotes may be delivered, mailed, faxed, or emailed (zterry@peoriaparks.org) to the Planning Offices.

Newman Greens

Download Planholder List CSV

Project Manager:

Rebecca Fredrickson

A pre-bid meeting will be held on Tuesday, March 10, 2015 at 10:30 a.m.

 

Bids are due on Tuesday, March 17, 2015 at 1:30 p.m. at the Administrative Offices located at 1125 W. Lake Avenue, Peoria, IL 61614.

Newman Rootzone Mix

Download Planholder List CSV

Project Manager:

Becky Fredrickson

Bids due Monday, March 23, 2015 at 1:30 p.m.

RFQ Madison Golf Course Concrete Ledge

Download Planholder List CSV

Project Manager:

Mary Harden

Quotes are due on Tuesday, March 24, 2015 by 2:00 pm at the Planning, Design and Construction Division Office located in Bradley Park. Quotes may be faxed, emailed to mharden@peoriaparks.org, hand delivered or mailed to the Planning Office.

Tropics Classroom Window Replacement- Peoria Zoo

Download Planholder List CSV

Project Manager:

Mary Harden

A pre-proposal meeting will be held on Thursday, January 15, 2015 at 10:30 at the Peoria Zoo. Please meet at the Zoo’s main entrance.

 

Proposals are due on Tuesday, January 27, 2015 by 1:30 p.m. at the Administartive Offices located at 1125 W. Lake Avenue, Peoria, IL.

 

Please note that the Admin Offices are no longer located in Glen Oak Park.

Peoria Stadium Softball Fencing

Download Planholder List CSV

Project Manager:

Zach Terry

A pre-bid meeting will be held on Wednesday, November 12, 2014 at 11:00 a.m. Please meet at Peoria Stadium Field #4.

 

Bids are due Tuesday, November 18, 2014 at 1:30 p.m. at the Park District Administrative Offices located at 1125 W. Lake, Peoria, IL.

District Wide relighting

Download Planholder List CSV

District Wide Relighting-

Franciscan Recreation Complex

Bradley Park Equipment Service Center

 

Project Manager

Zach Terry

 

For Addendum 1, Click HERE.

Pre-Bid meeting to be held at Bradley Park Equipment Service Center on Tuesday October 21, 2014 at 10:30 a.m.

Bids Due Tuesday October 28, 2014 at 1:30 p.m.

Newman Private Water Main and Hydrant

Download Planholder List CSV

Private Water Main and Fire Hydrant at Newman Golf Course

Project Manager:

Mike Friberg

Bids due October 14, 2014 at 1:30 pm

Riverplex Roof Ladder

Download Planholder List CSV

Riverplex Roof Ladder and Access Platform

 

Project Manager:

Zach Terry

A Pre-bid meeting will be held at the project site on Wednesday, September 24, 2014 at 11:00 a.m.

Bids are due Tuesday, September 30, 2014 at 1:30 p.m. at the Peoria Park District Administrative Offices at 1125 W. Lake Ave., Peoria, Illinois 61614.

Lakeview Park Sidewalk Replacement

Download Planholder List CSV

Lakeview Park Sidewalk Replacement

Project Manager:

Zach Terry

 

For Addendum #1, click HERE.

A pre-bid meeting will be held on Thursday, September 4, 2014 at 10:00 a.m. at 1125 W. Lake in front of the Noble Center.

Bids are due Thursday, September 11, 2014 at 1:30 p.m. at the Park District Administrative Offices located at 1125 W. Lake Avenue, Peoria, IL 61614.

RFP Kinsey Memorial Fountain Stone Restoration

Download Planholder List CSV

Kinsey Memorial Fountain Stone Restoration

Project Manager:

Mary Harden

A pre-proposal meeting will be held on Tuesday, September 2, 2014 at 10:00 a.m. at the fountain. The fountain is located under a shlter nead the entrance of Glen Oak Park off of Prospect Road.

Proposals are due on Tuesday, September 9, 2014 at 1:30 p.m. at the Park District Administrative Offices located at 1125 W. Lake Avenue, Peoria, IL 61614.

 

Wilhelm Bike Trail Phase III

Download Planholder List CSV

Wilhelm Bike Trail – Phase III

End of Existing Trail to Radnor Road

 

Project Manager:

Mary Harden

A pre-bid meeting will be held at the intersection of the Rock Island Trail and Wilhelm Road, just west of the bridge, on Tuesday, August 12, 2014 at 10:00 a.m.

 

Bids are dues on Tuesday, August 19, 2014 at 1:30 p.m. at the Park District Administrative Offices located at 1125 W. Lake Avenue, Peoria, IL 61614.

 

Please note the Admin Offices are no longer located in Glen Oak Park.

District Wide Aboveground Storage Tanks

Download Planholder List CSV

District Wide Aboveground Storage Tanks

Project Manager:

Zach Terry

 

For Addendum #1, click HERE

Bids are due Tuesday, August 5, 2014 at 1:30 p.m. at the Peoria Park District Administrative Offices at 1125 W. Lake Ave.

 

Please note that the Administrative Offices are no longer located in Glen Oak Park.

Tawny Oaks Welcome Center

Download Planholder List CSV

Tawny Oaks Welcome Center

Project Manager:

Mary Harden

A pre-bid meeting will be held at the site on Tuesday, July 29, 2014 at 10:00 am.

 

Bids are due Tuesday, August 12, 2014 at 11:00 a.m. at the Peoria Park District Administrative Offices at 1125 W. Lake Avenue.

Please note that the Administrative Offices are no longer located in Glen Oak Park.

Bridge and Trail Landscaping

Download Planholder List CSV

Bridge and Trail Landscaping

Peoria Park District Rock Island Greenway at Knoxville Ave.

 

For Addendum #1, click HERE

Project Manager:

Mike Friberg

 

 

 

test

Pre-Bid Meeting to be held at the project site on July 29th at 10:00 a.m.

Bids are due August 5, 2014 at 1:45 p.m. at the Peoria Park District Administrative Offices at 1125 W. Lake Ave.

Please note that the Administrative Offices are no longer located in Glen Oak Park.

Request for Quotes:

Exterior Painting – East Wall – Noble Center

 

For RFQ Documents, click HERE

Please submit written quotes by Thursday, May 29, 2014 at 2:00 p.m. Quotes may be delivered, mailed, faxed, or emailed to the Planning Offices.

Request for Quotes:

Pre-Cast Concrete Mile Marker Posts

Peoria Park District Rock Island Greenway

 

For RFQ Documents, please click HERE

Please submit written quotes by Friday, June 6, 2014 at 2:00 p.m. Quotes may be delivered, mailed, faxed, or emailed to the Planning Offices.

Request for Quotes:

Concrete removal and replacement at Lower Grand View Drive.

 

For RFQ Documents, please click HERE.

Please submit written quotes by Tuesday, June 17, 2014 at 2:00 p.m.. Quotes may be hand delivered, mailed, faxed or emailed (mharden@peoriaparks.org) to the Planning Office located in Bradley Park.

RFP-CEFCU Center Stage Truss Replacement

Download Planholder List CSV

RFP-CEFCU Center Stage Truss Replacement

 

Project Manager:

Zach Terry

A pre-proposal meeting will be held at the CEFCU Center Stage, 200 NE Water Street on Tuesday, July 22, 2014 at 10:30am.

 

Proposals are due on Thursday, July 31, 2014 at 1:30 pm at the Planning Office Located in Bradley Park, 1314 N. Park Road, Peoria, IL.

Request for Quote:

Owens Center Ice Rink #2 Relighting

For RFQ Documents, please click HERE

 

Please submit written quotes by Wednesday, June 18, 2014 at 11:00 a.m.. Quotes may be hand delivered, mailed, faxed or emailed (zterry@peoriaparks.org) to the Planning Office located in Bradley Park.

Tawny Oaks Site Development Project Manual

Download Planholder List CSV

Project Manager:

Mary Harden

 

For Addendum #1, click HERE.

For Addendum #2, click HERE.

A pre-bid meeting will be held at the site on Tuesday, May 27, 2014 at 9:30 a.m.

 

Bids are due on Tuesday, June 3, 2014 at the Peoria Park District Administrative Office located at 1125 W. Lake Avenue, Peoria, IL.   Please note that the Administrative Offices are longer located in Glen Oak Park.

Luthy Botanical Garden South Greenhouse Vent Repair

Download Planholder List CSV

Project Manager:

Mary Harden

There is no scheduled pre-proposal meeting for this project.

Proposals are due Tuesday, June 3, 2014 at 1:30 p.m. at the Peoria Park District Administrative Office at 1125 W. Lake Avenue, Peoria, IL.  Please note that the Administrative Offices are no longer located in Glen Oak Park.

Request for Quotes:

Replacement Windows and Trim at the Sommer Park Day Camp Building

 

For RFQ Documents, please click HERE

 

Please submit written quotes by Wednesday May 14, 2014 at 2:00 p.m.  Quotes may be delivered, mailed, faxed, or emailed to the Planning Offices.

Request for Quotes:

Exterior Painting of Sommer Park Day Camp Facilities.

 

For RFQ Documents, please click HERE

Please submit written quotes by Thursday May 15, 2014 at 2:00 p.m.  Quotes may be delivered, mailed, faxed, or emailed to the Planning Offices.

Request for Quote:

Above Ground Storage Tank Painting

 

For RFQ Documents please click HERE

Please submit written quotes by wednesday May 14, 2014 at 2:00 p.m.  Quotes may be delivered, mailed, faxed, or emailed to the Planning Offices.

Request for Quote:

Tawny Oaks Basement Wall Stabilization

 

For Quote documents, Click HERE.

Please submit written quotes by wednesday May 7, 2014 at 2:00 p.m.  Quotes may be delivered, mailed, faxed, or emailed to the Planning Offices.

Request for Quotes:

Noble Center Fabricated Metal Signage and Installation

 

For RFQ documents, click HERE.

Please submit written quotes by Friday, May 2, 2014 at 2:00 p.m. Quotes may be delivered, mailed, faxed, or emailed to the Planning Offices.

Request for Quote:

Glen Oak Park Picnic Shelter Roof Replacement

For Quote Documents, click HERE

Please submit written quotes by Friday May 2, 2014 at 2:00 p.m. quotes may be mailed, faxed, or emailed tot he Planning Offices.

Grand View Drive Erosion Remediation 2

Download Planholder List CSV

Project Manager:

Mike Friberg

Pre-Bid meeting at Grand View Drive and Miller Avenue Tuesday, April 8th, 2014 at 2:00 p.m.

Bids Due Tuesday, April 15th at 1:30 p.m.

PLEASE NOTE THAT THE PARK DISTRICT ADMINSTRATIVE OFFICES HAVE MOVED TO LAKEVIEW PARK (1125 W. Lake Ave.) AND ARE NO LONGER AT THE GLEN OAK PAVILION. BIDS MUST BE SENT OR DELIVERED TO THE NEW OFFICES AT 1125 W. LAKE AVE.

Peoria Playhouse Children’s Museum

Download Planholder List CSV

Project Manager:Becky Fredrickson

For Addendum #1, click HERE

For Addendum #2, click HERE

Pre-Bid Meeting Tuesday, April 15, 2014 at 10:00 a.m.Bids Due Tuesday, April 29th, 2014 at 1:30 p.m.

Invite to Bid Aquatic Climber

Download Planholder List CSV

Project Manager: Mary Harden

This bid is for material only.

No pre-bid meeting will be held.

Bids are due by 1:30 pm on Tuesday, February 25, 2014 at the Peoria Park District Administrative Offices. Please note that the new administrative office is located at 1125 W. Lake Avenue, Peoria, IL 61614.

Request for Quote:

Newman Golf Course Clubhouse Carpet Replacement

 

For Quote Documents please click HERE

Please submit written quotes by Friday, January 17, 2014 at 2:00 p.m.. Quotes may be delivered, mailed, faxed, or emailed mfriberg@peoriaparks.org to the Plannig Offices.

Exhibit Fabrication – Peoria PlayHouse Children’s Museum Redirect

Download Planholder List CSV

Project Manager:

Rebecca Fredrickson

 Please note the proposal package is 261 MB. After filling out planholder information, you will receive a Dropbox address to download the proposal documents. It may take significant time to download.

Proposers may wish to request a copy of the native Excel matrix for proposal purposes. Please contact the project manager at (309)-686-3386 or rfredrickson@peoriaparks.org for a copy.

 

For Addendum 1, please click HERE.

For Addendum 2, please click HERE

For Addendum 3, please click HERE.

For Addendum 4, please click HERE.

Pre Proposal Meeting: Tuesday, January 14, 2014, 10:00 a.m. CST at the project site.

Proposals are due Tuesday, February 4, 2014 at 1:30 p.m. CST  at the Glen Oak Pavilion Board Room.

Proposal period has been extended. Proposals are now due Thursday, February 13, 2014 at 1:30 p.m. CST at the Glen Oak Pavilion Board Room.

RFP North Greenhouse Vent Repair

Download Planholder List CSV

Project Manager: Mary Harden

A pre-proposal meeting will he held at the greenhouse on Tuesday, October 8, 2013 at 10:00a.m.Proposals are due by 1:30 p.m. on Tuesday, October 15, 2013 at the Glen Oak Pavilion located in Glen Oak Park.

Pedestrian Bridge Replacement at Owens Center

Download Planholder List CSV

Project Manager:

Rebecca Fredrickson

A pre-bid meeting will be held at the site (behind Owens Center) on Tuesday, October 1, 2013 at 9:00 a.m. 

 

Bids are due by 1:30 p.m. at the Glen Oak Pavilion in Glen Oak Park.

Request for Quote:

Clerestory Window Repair and Maintenance – Lakeview Center

 

For Quote Documents please click HERE

 

Please submit written quotes by Friday, October 11, 2013 at 2:00 p.m.. Quotes may be delivered, mailed, faxed, or emailed mfriberg@peoriaparks.org to the Planning Division offices.

Culvert and Road Repair – Lakeview Park

Download Planholder List CSV

Project Manager:

Rebecca Fredrickson

 

For addendum #1 click HERE

A pre-bid meeting will be held at the project site (west of Owens Center in Lakeview Park) on Tuesday, October 1, 2013 at 10:00 a.m.

Bids are due by 2:00 p.m. on Tuesday, October 8, 2013 at the Glen Oak Pavilion located in Glen Oak Park.

Request for Quote:

Sanitary Sewer Connection – Kellogg Golf Course Maintenance Building

 

For Quote documents, click HERE.

Please submit written quotes by October 1, 2013 by 2:00 p.m. Quotes can be hand delivered, mailed, faxed or emailed (rfredrickson@peoriaparks.org) to the Planning Office located in Bradley Park.  

Request for Quote:

Forest Park Nature Center Breaker Box Replacement

For quote documents, click HERE

Please submit written quotes by Wednesday, October 2, 2013 at 2:00 p.m.. Quotes may be delivered,

mailed, faxed, or emailed (mfriberg@peoriaparks.org) to the Planning Offices at the address above.

Request for Quote:

Drinking Fountain and Frost-Free Hydrant at W.H. Sommer Park North.

For Quote documents, please click HERE

Please submit written quotes by Friday, September 20, 2013 at 2:00 p.m.. Quotes may be delivered, mailed, faxed, or emailed (mfriberg@peoriaparks.org) to the Planning Offices.

Bike Trail Bridge and Approaches

Download Planholder List CSV

Project Manager:

Mike Friberg

 

PLEASE NOTE: The project manual and plans download is a large file (60 MB) and may take significant time to download. After filling in your contact information for the official planholders list, and clicking download, check your web browsers prompt (usually in yellow at the bottom or top of your screen) for where on your computer you want the file to download. This website itself will not let you know when the download is complete; that’s up to your web browser.

 

CLICK HERE FOR ADDENDUM 1: PLEASE READ CAREFULLY. ALSO NOTE THAT BID OPENING DATE HAS CHANGED.

 

Pre-Bid meeting to be held on Monday June 24, 2013 at 1:30 p.m. at the project site.

Bids are due Tuesday, July 2, 2013 at 1:30 p.m. at the Peoria Park District Administrative offices in Glen Oak Park.

Contractors may have received letters regarding the Wilhelm Road Bike Trail, originally scheduled to go out to bid on June 25, 2013. At this time, the Wilhelm Trail project has been delayed. New letters will go out when we have  more information.

Request for Quote:

Roof Replacement at 1002 Merkel Lane, Edelstein, IL

For quote documents, click HERE.

A pre-quote meeting will be held at the site on Tuesday, July 9, 2013 at 10:30a.m. Please see quote package for directions.

All quotes to be considered shall be submitted by 2:00 p.m. on or before Tuesday, July 16, 2013. Quotes shall be send to Mary Harden at the Planning, Design and Construction Division, 1314 N. Park Road, Peoria, IL 61604. Quotes can also be emailed to mharden@peoriaparks.org or faxed to 686-3383.

Request for Quote:

Colobus Dayroom Window Replacement at the Peoria Zoo

For quote documents, click HERE.

A pre-quote meeting will be held at the site on Thursday, June 20, 2013 at 10:00 a.m. Please meet at gate 8.

All quotes to be considered shall be submitted on or before Friday, June 28, 2013 at 2:00 p.m. Quotes shall be sent to Mary Harden at the Planning, Design and Construction Division, 1314 N. Park Road, Peoria, IL 61604. Quotes can also be emailed to mharden@peoriaparks.org or faxed to 686-3383.

CharterOakSouthDamRepair

Download Planholder List CSV

Project Manager:

Mike Friberg

 

For Addendum #1, Click HERE

Pre-Bid: Tuesday June 18, at 10:00 a.m. at the project site.

Bids Due: Tuesday June 25, at 1:30p.m. at the Glen Oak Pavilion.

Request for Quote:

Madison Golf Course Clubhouse Limestone Pier Caps.

For Quote documents, click HERE.

A pre-quote meeting will be held at the site on Monday, May 6, 2013 at 2:00 p.m.

Quotes are due by 2:00p.m. on or before Friday, May 10, 2013 at the Planning, Design and Construction Division offices in Bradley Park.  Quotes can be faxed to 309-686-3383, emailed to mharden@peoriaparks.org, hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604.

Adventure Grove Site Development

Download Planholder List CSV

Project Manager:

Mike Friberg

For Addendum #1, click HERE

Pre-Bid Meeting: Tuesday, April 23, 2013 at 10:00 a.m. at the project site.

Bids Due: Tuesday May 7, 2013 at 1:30 p.m. at the Glen Oak Pavilion, 2218 N. Prospect, Peoria, IL.

RFP–World War I Monument Restoration-Grand View Drive

Download Planholder List CSV

Project Manager:

Mary Harden

A mandatory pre-proposal meeting will be held at the project site on Tuesday, January 15, 2013 at 1:00 p.m.

 

Prposals are due at 1:30 p.m. on Tuesday, January 29, 2013 at the Admin Office located in Glen Oak Pavilion, 2218 N. Prospect, Peoria, IL.  

RFP-LFAC Waterslide Fiberglass Repairs- Slide A

Download Planholder List CSV

Project Manager:

Mary Harden

A pre-proposal meeting will be held at the project site on Tuesday, January 22, 2013 at 10:00 a.m.

 

Proposals are due at 1:00 p.m. Tuesday, January 29, 2013 at the Admin Office located in Glen Oak Pavilion, 2218 N. Prospect, Peoria, IL .

Design Build Services for Lakeview Center Renovation

Download Planholder List CSV

Project Manager:

Rebecca Fredrickson

 

Click HERE for Addendum #1

 

Click HERE for 1963 original floor plans of Lakeview.

Please note that this download is over 300MB in pdf format and may easily take 5-10 minutes to download.

Pre-Proposal Meeting January 23, 2013 at 10:00 a.m.

Proposals are due March 5, 2013 at 1:30 p.m. at the Administrative Offices located in Glen Oak Pavilion.

Trail Construction RTP Phase 3 -Green Valley Camp Project Manual

Download Planholder List CSV

Please note that this project has specific Contractor qualifications noted in the specifications, and trailbuilding references are required to be submitted with the bid.

Please also note that the Project Manaul is a large download, due to the inclusion of a large aerial photo and topographic map in the manual.

 

Project Manager:

Mike Friberg

 

For Addendum #1 Please Click HERE

For Addendum #2 Please Click HERE

Bids are due February 26, 2013 at 1:30 p.m. at the Glen Oak Pavilion

Bidding period has been extended to Thursday, March 14, 2013

Tiger Fence Modifications Project Manual

Download Planholder List CSV

Project Manager:

Becky Fredrickson

Pre-Bid on Tuesday, February 12, 2013 at 10:00 a.m. at the project site.

 

Bids Due: Tuesday, February 19, 2013, at 1:30 p.m. at the Glen Oak Pavilion.

Spanish Cannon Display

Download Planholder List CSV

Project Manager:

Mike Friberg

Bids received until Tuesday March 12, 2013 at 1:30 p.m. at the Glen Oak Pavilion

Pre-Bid meeting on Tuesday, March 5, 2013 at 10:30 a.m. at the Project Site.

ZooMultiPurposeRoomRenov

Download Planholder List CSV

Project Manager:

Becky Fredrickson

 

For Addendum #1 Click HERE

Pre-Bid on Wednesday, March 27th, 2013 at 10:00 a.m. at the project site.

 

Bids are due on Wednesday April 3, 2013, at 11:00 a.m. at the Glen Oak Pavilion

Request for Quotes:

Water Service for Restroom Building-

Green Valley Camp

 

For Quote documents, click HERE

Quotes are due by Friday, April 19, 2013 at 2:00 p.m. at the Planning, Design, and Construction Division offices in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mfriberg@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604.

Request for Quotes:

Wire Rope Guardrail – Grand View Drive at Miller Ave.

Please click HERE for RFQ package

Quotes are due by Tuesday, December 18, 2012 at 2:00 p.m. at the Planning, Design, and Construction Division offices in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mfriberg@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604.

RFP-Asbestos Abastement- Lakeview Center

Download Planholder List CSV

Click HERE for Addendum #1

Click HERE for Addendum #2

 

Project Manager:

Rebecca Fredrickson

A Pre-proposal meeting will be held at the project site at 10:00 a.m. on Wednesday, November 21, 2012.

Proposals are due at 1:30 p.m. on Tuesday, January 8, 2013 at the Admin office located in Glen Oak Pavilion, 2218 N. Prospect, Peoria, IL.

Curb and Gutter Replacement

Glen Oak Park

 

Click HERE for RFQ package.

Quotes are due Tuesday, September 18, 2012 by 2:00 p.m. at the Planning, Design, and Construction Division offices in Bradley Park. Quotes can be faxed, emailed, or hand -delivered. No bid bond is required.

Waterslide Structure Repair – Lakeview Family Aquatic Center

Download Planholder List CSV

For Addendum #1, Click HERE

 

Please read addendum #1 to understand the limitations of the report before downloading the following.

For Structural Report with photographs, click HERE

 

Project Manager:

Mike Friberg

Pre-Bid: Tuesday September 18, 2012 at 9:00 a.m.

Bids Due: Tuesday September 25, 2012 at 1:30 p.m.

Request for Quotes- African Lodge Entry Lighting

Peoria Zoo at Glen Oak Park

Please click HERE for RFQ package.

Quotes are due on Tuesday, October 23, 2012 by 2:00 p.m. at the Planning, Design and Construction office located in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to rfredrickson@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604.

Request for Quotes – Animal Hospital Double Doors

Peoria Zoo in Glen Oak Park

 

Please click HERE for RFQ package.

Quotes are due Wednesday, October 24, 2012 by 2:30 p.m. at the Planning, Design and Construction office located in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mharden@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604.

Request for Quotes- Fire Hydrant Removal

Please click HERE for RFQ package.

Quotes are due by Friday October 26, 2012 at 2:00 p.m. at the Planning, Design, and Construction Division offices in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mfriberg@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604.

Request for Quotes: West Cabin Windows at Camp Wokanda

Please click HERE for RFQ package.

Quotes are due by Thursday October 25, 2012 at 2:00 p.m. at the Planning, Design, and Construction Division offices in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mfriberg@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604.

Family Restroom at Green Valley Camp

Download Planholder List CSV

Click HERE for Addendum #1

Click HERE for Addendum #2

 

Project Manager:

Mike Friberg

A Pre-Bid meeting will be held at the project site at 10:30 a.m. on Tuesday November 6, 2012.

Bids are due at 1:30 p.m.on Tuesday, November 13, 2012 at the Glen Oak Pavilion.

Sidewalk Replacement

Laura Bradley Park

 

Click HERE for RFQ package.

Quotes are due Tuesday, September 18, 2012 by 2:00 p.m. at the Planning, Design, and Construction Division offices located in Bradley Park. Quotes may be faxed, emailed, or hand-delivered. No bid bond is required.

Bradley Park ESC Small Parks Roof Replacement

Download Planholder List CSV

Project Manager:

Glenn Kissinger

A pre-bid meeting will be held at the site on Tuesday, September 11, 2012 at 1:30 p.m.

 

Bids are due Tuesday, September 18, 2012 at 1:30 p.m. at Glen Oak Pavilion.

Wilhelm Bike Trail Project Manual

Download Planholder List CSV

Project Manager:

Mary Harden

A pre-bid meeting will be held at 10:00a.m. on Tuesday, Sept. 11, 2012. Please meet at the intersection of Country Ridge Lane and Wilhelm.

Bids are due Tuesday, September 18, 2012 at 1:45 p.m. at Glen Oak Pavilion.

Replacement Windows and Trim

Sommer Park Residence and Park Office

 

Clicke HERE for RFQ

 

Quotes are due August 10, 2012 at 4:00 p.m.

Division office is located in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mfriberg@peoriaparks.org, or hand delivered to the address noted above.

 

 

Furnace and Air Conditioner Replacement

Bio Center at the Peoria Zoo in Glen Oak Park

 

Click HERE for RFQ.

Quotes are due Thursday, August 9, 2012 by 2:00p.m..

Quotes can be faxed to (309) 686-3383, emailed to mharden@peoriaparks.org or hand delivered to the Planning Office, located in Bradley Park, 1314 N. Park Road, Peoria, IL .

Brick Repointing and Brick Replacement

Bradley Park

 

Click HERE for RFQ.

Quotes are due on August 14, 2012 by 2:00p.m..

Quotes can be faxed to 309-686-3383, emailed to mharden@peoriaparks.org, or hand delivered to the Planning Office, located in Bradley Park, 1314 N. Park Road, Peoria, IL.

Block Wall – Golf operations Facility

Download Planholder List CSV

Project Manager:

Rebecca Fredrickson

Pre-bid at the project site on Tuesday, August 7, 2012.

 

Bids due Tuesday, August 14, 2012.

 

Ice Rink Relighting – Owens Recreation Center

 

Click HERE for RFQ.

Quotes are due on Tuesday, August 28, 2012 by 2:00p.m.

Quotes can be faxed to (309) 686-3383, emailed to rfredrickson@peoriaparks.org or hand delivered to the Planning Office, located in Bradley Park, 1314 N. Park Road, Peoria, IL.

Conservatory Vent Repairs – Luthy Botanical Gardens

Download Planholder List CSV

Project Manager:

Mary Harden

A Pre-Proposal meeting will be held at the project site on July 24, 2012 at 10:00 a.m..

Proposals are due Tuesday, July 31, 2012, at 1:30 p.m. at the Glen Oak Pavilion.

Grand View Drive Erosion Remediation

Download Planholder List CSV

Project Manager:

Mike Friberg

A MANDATORY pre-bid meeting will be held at the project site on Tuesday, July 24, 2012 at 9:30 a.m.. Contractors not attending may be disqualified from bidding.

 

Bids are due Tuesday, July 31, 2012 at 1:45 p.m. at the Glen Oak Pavilion Board Room.

Locker Room Carpet Replacement – RiverPlex

Download Planholder List CSV

Project Manager:

Rebecca Fredrickson

A Pre-Bid meeting will be held at the RiverPlex Recreation and Wellness Center on Tuesday, July 24, 2012 at 9:00 a.m.

 

Bids are due Tuesday July 31, 2012 at 1:00 p.m. at the Glen Oak Pavilion

 

Interior Painting – RiverPlex

Download Planholder List CSV

Project Manager

Rebecca Fredrickson

A Pre-Bid meeting will be held at the RiverPlex Recreation and Wellness Center on Tuesday, July 24, 2012 at 9:30 a.m.

Bids are due Tuesday July 31, 2012 at 1:15 p.m. at the Glen Oak Pavilion.

Riverplex Waterslide  Stair Painting

 

Click HERE for RFQ.

 

Project Manager:

Rebecca Fredrickson

Quotes will be due on Tuesday, July 17, 2012 by 2:00 p.m. at the Planning, Design and Construction

Division office located in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to

rfredrickson@peoriaparks.org

 or hand delivered to the address noted above.

 

Central Park Pool Water Heater Replacement.

 

Click HERE for RFQ package.

 

Project Manager:

Rebecca Fredrickson

 

 

 

 

Quotes will be due on Tuesday, July 17, 2012 by 2:00 p.m. at the Planning, Design and Construction

Division office located in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to:

 

 

 

rfredrickson@peoriaparks.org

 

 or hand delivered to the address noted above. 

 

Forest Park Nature Center Window Replacement

Click HERE for RFQ Package

A Pre-Quote Meeting will be held at the site on Tuesday, June 19, 2012 at 1:30 p.m. All quotes to be
considered shall be submitted on or before June 26, 2012 at 2:00 p.m.

Quotes may be faxed, emailed, or mailed to the Planning Division offices.

Hiking Trail Bridges – Green Valley Camp – IRBT Phase 3

Download Planholder List CSV

Project Manager:

Mike Friberg

A Pre-Bid meeting will be held on June 20, 2012, at 10:00 a.m.

Meet at the corner of E. Fairview Street and E. Brookview Lane, after which the Owner’s Representative will lead potential bidders tot he project site by private gravel road.

Window Replacement – Riverplex Recreation and Wellness Center

Download Planholder List CSV

Project Manager:

Rebecca Fredrickson

A Pre-Bid meeting will be held at the Project site  on June 13, 2012 at 10:00 a.m.

Bids due Wednesday, June 20, 2012 at 10:00 a.m.

 

Auto Service Building Roof Replacement

Download Planholder List CSV

Project Manager:

Glenn Kissinger

 Click HERE for Addendum #1

Click HERE for Addendum #2

A Pre-Bid meeting will be held on Tuesday, June 12, 2012 at 1:00 p.m.

Bids are due Tuesday, June 19, 2012 at 1:30 p.m.

Storm Sewer Improvements – Bradley Park

Download Planholder List CSV

Project Manager:

Mike Friberg

A Pre-Bid meeting will be held at the project site on Tuesday, June 12, 2012 at 9:00 a.m.

Bids are due Tuesday, June 19, 2012 at 2:00 p.m.

 

Bradley Park Service Building Roof Replacement

Download Planholder List CSV

Click HERE for Addendum #1

 

Project Manager:

Glenn Kissinger

A Pre-Bid Meeting will be held Tuesday, May 8, 2012 at 1:00 p.m.

Bids are due by 1:30 p.m. Tuesday, May 15, 2012 at the Glen Oak Park Pavilion.

Bike Trail Slope Hydroseeding

Click HERE for RFQ documents.

Pre-Quote Tuesday, May 8, 2012 at 10:00 a.m.. Meet at the end of Candletree Drive.

Proctor Tile Roof PhIV

Download Planholder List CSV

 

Click HERE for Addendum #2

Click HERE for Addendum #1.

 

Project Manager:

Glenn Kissinger

Pre-Bid meeting on-site 1:00 p.m. Monday, May 7, 2012.

Bids due 1:30 p.m. Tuesday, June 5, 2012 at the Glen Oak Pavilion.

RFP Luthy Conservatory Vent Repairs

Download Planholder List CSV

Click HERE for Addendum #1.

 

Project Manager:

Mary Harden

Pre-proposal meeting is scheduled for Tuesday, April 24, 2012 at 10:30 a.m. at Luthy Botanical Garden.

 

Proposals due: Tuesday, May 1, 2012 at 1:30 p.m. at the Park District Administrative Office in Glen Oak Park.

 

Hiking Trail Improvements Route 6 ROW

Download Planholder List CSV

This project includes: Traffic control on Route 6, tree clearing and grubbing, installation of chain link fencing and gates, construction of wood trail steps and boardwalk, wire mesh fence modification and removal, and restoration of the site.

 

Click HERE for Addendum #1.

 

Project Manager:

Mike Friberg

Pre-Bid Meeting:

April 4th at 2:00 p.m. Please note time change!

Due to Access restrictions by IDOT, approach to the project site will be “cross country” hiking for approximately 1100 feet through rough and hilly terrain. Please meet at the corner of E. Fairview Street and E. Brookview Lane, after which the Owner’s Representative will lead potential bidders to the project site via private gravel road and then by foot.

Bids Due: Tuesday April 10, 2012 at 9:30 a.m.

Safety Town Shelter and Concrete Work

Download Planholder List CSV

Project Manager:

Mike Friberg

 

Click HERE for Addendum #1

Pre-Bid Meeting: Thursday, March 29 at 9:00 a.m. at Safety Town – 6518 N. Sheridan Road

Bids Due: April 3, 2012 at 1:30 p.m.

Block Wall Demolition and Removal – Golf Operations Facility 6017 N. Knoxville Ave.

Click HERE for RFQ

 

Project Manager:

Becky Fredrickson

Quotes are due Thursday March 22, 2012 by 2:00 p.m. at the Planning, Design, and Construction Division offices located in Bradley Park.

Aviary Design and Construction RFP

Download Planholder List CSV

Project Manager:

Mary Harden

Proposals are due at 1:30 p.m. on Thursday, March 15, 2012 at the Park District Administrative Office in Glen Oak Park.

back to top

Peoria Bid Tabs

ProjectInformationStatus
Locker Room Renovation Phase 2 – Riverplex

Project Manager:

Becky Fredrickson

For consideration at the April 11, 2023 Board Meeting.

Boiler Replacement – Peoria Players Theater – 2nd bid

Project Manager:

Mike Friberg

Well, its over budget, so we’re looking for money. Hopefully it will go to the board for consideration at the February 8, 2023 meeting.

Stormwater Inlet Replacement – Peoria Playhouse Children’s Museum

Project Manager:

Mike Friberg

To be considered at the October 26, 2022 Board meeting

Parking Lot Reconstruction – Peoria Playhouse Children’s Museum

Project Manager:

Mike Friberg

Over budget/Not awarded. Stormwater portion broken out and bid separately. Paving to be rebid in 2023.

Boiler Replacement – Peoria Players Theatre

Project Manager:

Mike Friberg

To be considered at the July 13, 2022 board meeting.

Chip and Seal – District-Wide 2022

Project Manager:

Mike Friberg

To be considered at the 7/13.22 Board meeting

Basketball Court Pavement Renovation – John H. Gwynn Jr. Park

Project Manager:

Mike Friberg

To be considered at the May 25, 2022 Board Meeting

Locker Room Renovation – RiverPlex

Project Manager:

Becky Fredrickson

To be considered at the  June 8, 2022 board meeting.

Roof Replacement – Logan Recreation Center

Project Manager:

Becky Fredrickson

To be considered at the May 25, 2022 board meeting.

Kellogg Service Building Roof

Project Manager:

Becky Fredrickson

To be considered at the April 20, 2022 Board meeting.

Sommer Park Shed Roof

Project Manager:

Becky Fredrickson

To be considered at the April 20, 2022 Board Meeting

Shelter Roof Replacement- Bradley Park

Project Manager: Dave Voorhees

To be considered at the April 20, 2022 Board Meeting.

RiverPlex Pool Resurfacing

Project Manager: Rebecca Fredrickson

To be considered at the April 20, 2022 Board Meeting.

RiverPlex Natatorium Painting

Project Manager: Rebecca Fredrickson

To be considered at the April 20, 2022 Board Meeting.

Flooring Removal and Replacement- Logan Rec Center

Project Manager: Mary Harden

To be considered at the April 13, 2022 Board Meeting.

Stadium Roadway Replacement

Project Manager: Mike Friberg

Awarded 3/23 to Tazewell County Asphalt. $49,261 base bid plus alternate.

Asphalt Path Replacement – Rock Island Greenway Route 6 to Chanute Road Phase 1

Project Manager: Mike Friberg

Awarded 3/23/22 to Hoerr’s Blacktopping and Sealcoating for $57,525.00

Bridge Railing Improvement – Laura Bradley Park

Project Manager – Mike Friberg

Awarded 3/9/22 to Kelley Ironworks for $24,795.00

Safety Town Bridge Railing

Project Manager: Mike Friberg

Over budget – will be re-bid

Exterior Column Repair- Golf Learning Center

Project Manager: Mary Harden

To be considered at the February 23, 2022 Board Meeting.

REQUOTE RFQ Madison Exterior Improvements

Project Manager: Mary Harden

To be considered at the November 10, 2021 Board Meeting.

Partial Roadway Replacement – Peoria Stadium

Project Manager:  Mike Friberg

To be considered at the July 14, 2021, Board Meeting.

Masonry Repairs – Proctor Recreation Center

Project Manager:  Becky Fredrickson

To be considered at the June 23, 2021, Board Meeting.

Curb & Gutter Improvements – Glen Oak Park Lower

Project Manager:  Mary Harden

To be considered at the June 9, 2021, Board Meeting.

Curb & Gutter Improvements – Bradley Park

Project Manager:  Mary Harden

To be considered at the June 9, 2021, Board Meeting.

Tennis Court Surface Improvements Re-Bid – Bradley Park

Project Manager:  Mary Harden

To be considered at the May 26, 2021, Board Meeting.

Roadway Bridge and Approaches – Bradley Park South Bridge

Project Manager:  Mike Friberg

Under consideration.

Tennis Court Surface Improvements – Glen Oak Park

Project Manager:  Mary Harden

Award pending.

Tennis Court Surface Improvements – Bradley Park

Project Manager:  Mary Harden

Award pending.

Lodge Kitchen Exhaust Hood – Peoria Zoo

Project Manager:  Becky Fredrickson

To be considered at the April 14, 2021, Board Meeting.

Asphalt Path Replacement – Allen to Route 6 Rock Island Greenway

Project Manager:  Mike Friberg

To be considered at the April 14, 2021, Board Meeting.

Natatorium HVAC Replacement – Riverplex

Project Manager:  Becky Fredrickson

To be considered at the March 24, 2021, Board Meeting.

Accessible Parking and Path Improvements – Madison Golf Course

Project Manager: Mary Harden

To be considered at the March 24, 2021, Board Meeting.

Purchase of Dredge, Trailer, and Accessories

Project Manager:  Mike Friberg

Under review.  To be awarded at the November 18, 2020, Board Meeting.

Nature Center Exhibits – Forest Park Nature Center

Project Manager:  Mary Harden

To be considered at the October 21, 2020, Board Meeting.

Detweiller and Lakeview Park Parking Lot Striping

Project Manager:

Mike Friberg

Awarded

Curb and Gutter Removal and Replacement Glen Oak Park

Project Manager: Mary Harden

To be awarded at the October 14, 2020 Board Meeting.

Pickleball Court Re-Bid Glen Oak Park

Project Manager: Mary Harden

To be considered at the August 12, 2020 Board Meeting.

Utility Storage Building at Donovan Park

Project Manager:  Becky Fredrickson

To be considered at the August 12, 2020, Board Meeting.

Asphalt Overlay – Rock Island Greenway

Project Manager: Mike Friberg

To be considered at the August 12, 2020 Board Meeting.

Backfill and Seeding – Chartwell Park

Project Manager: Mike Friberg

To be considered at the August 12, 2020 board meeting.

Pickleball Courts- Glen Oak Park

Project Manager: Mary Harden

All bids over budget.

2020 District Wide Chip and Seal

Project Manager:

Mike Friberg

Project to be considered at the June 24 Park Board Meeting.

Curb and Gutter Improvements North/Upper Laura Bradley Park

Project Manager: Mary Harden

Tentative award at the June 10, 2020 Board Meeting.

Underdrain at Rock Island Greenway Mile Marker 9.5

Project Manager:

Mike Friberg

to be considered at the May 27, 2020 Board Meeting.

Safety Town Asphalt Pavement Replacement

Project Manager: Mike Friberg

To be considered at the May 27, 2020 Board Meeting.

Proctor Parking Lot Repair

Project Manager: Mike Friberg

To be considered at the May 27, 2020 Board meeting.

Asphalt Path Replacement – Rock Island Greenway – Atlantic St. to Allen Rd.

Project Manager

Mike Friberg

Awarded to Tazewell County Asphalt at the May 13, 2020 Board Meeting

Asphalt Path Replacement -Franciscan Recreation Center

Project Manager:

Mike Friberg

Awarded to Tazewell County Asphalt at the May 13, 2020 Board Meeting

Quote Tab- RFQ Flooring Removal & Replacement – Franciscan Recreation Center

Project Manager: Mary Harden

Award pending.

Concrete Steps Replacement – Trewyn Park Pavilion

Project Manager:  Mike Friberg

Awarded to C&G Concrete Co.

Prairie Restoration

Project Manager:  Becky Fredrickson

Cork Flooring- Forest Park Nature Center

Project Manager: Mary Harden

2″ HDPE Boring – Newman Golf Course

Project Manager:  Mary Harden

Playground Resurfacing – Columbia Park

Project Manager:  Mike Friberg

To be considered at the October 23, 2019 Board Meeting.

Culvert Replacement – Chanute Road

Project Manager:  Mike Friberg

Awarded to Low Bidder Krumholz Brothers Landscaping on 10/9/2019.

Award amount: $255,500.00. Project to begin immediately. End date June 8, 2020.

Tennis Court Color Coating & Crack Repair – Sommer Park

Project Manager:  Mary Harden

To be considered at the August 28, 2019 Board Meeting.

Chiller Replacement – Riverplex

Project Manager:  Becky Fredrickson

To be considered at the August 14, 2019 Board Meeting.

Roof Replacement – Riverplex Pool

Project Manager:  Becky Fredrickson

To be considered at the August 14, 2019 Board Meeting.

Roof Replacement Bradley Park – ESC Paint Shop

Project Manager:  Becky Fredrickson

To be considered at the August 14, 2019 Board Meeting.

Stormwater Improvements – Grand View Drive at Grandview Ave. and IL Route 29

Project Manager:

Mike Friberg

To be considered at the July 24, 2019 Board meeting.

Curb & Gutter Improvements Laura Bradley Park

Project Manager: Mary Harden

Tentative award at the June 12, 2019 Board Meeting.

Asphalt Path Replacement – Chartwell Park

Project Manager:

Mike Friberg

To be awarded at May 22, 2019 board meeting.

2019 Used Equipment

Project Manager:

Becky Fredrickson

Barn Roof at Tawny Oaks Field Station

Project Manager:

Mike Friberg

Low bidder recommended for award at the November 7, 2018 Board meeting

ACCU Replacement – Lakeview Recreation Center

Project Manager:

Mike Friberg

Under Review

Door Replacement and Repair- Owens Ice Center

Project Manager:

Mary Harden

Tentative award to be made at the November 7, 2018 Board Meeting.

Bird Wing Roof Replacement at Forest Park Nature Center

Project Manager:

Mike Friberg

To be awarded at the October 17, 2018 Board meeting.

District Wide Sealcoating 2018

Project Manager:

Mike Friberg

To Board meeting on 9/12/18 for approval.

Rotary Trailhead at Donovan Park

Project Manager:

Mike Friberg

Project is over budget.

Natatorium Curtain Wall Painting RiverPlex

Project Manager:

Mary Harden

Pending

Natatorium Ceiling Painting Bid Tab

 

Project Manager: Mary Harden

Pending.

Lakeview Rec Front Desk and Hallway Finishes

Project Manager:

Mike Friberg

Pending approval at the June 27, 2018 board meeting.

Roof Replacement – Donovan Park Clubhouse – Upper Roof

Project Manager:  Becky Fredrickson

Pending approval at April 25, 2018 board meeting.

HISRA – Carpet Removal and Replacement

HISRA Quote Tab

Project Manager:  Mary Harden

New Restroom and Site Work

Project Manager: Mike Friberg

Over budget, but looking for additional funding. Possibly for consideration at the December 6, 2017 Board Meeting.

Lakeview Recreation Center Renovation

Project Manager: Mike Friberg

For consideration at the October 25, 2017 Board Meeting

Paved Trail Connection – Donovan Park

Project Manager:  Mike Friberg

Pending approval at the next Board Meeting, October 11, 2017.

Exterior Staining – Golf Learning Center

Project Manager:  Mary Harden

 

Pending approval at the next Board Meeting, October 11, 2017.

Tennis Court Perimeter Fence – Northtrail

Project Manager:  Mary Harden

Pending approval at the next Board Meeting, October 11, 2017.

Aviary Curtain Wall Replacement

Project Manager:  Mary Harden

Pending approval at the next Board Meeting, October 11, 2017.

Luthy Botanical Garden- Facade Improvements

Project Manager: Mary Harden

Pending approval at the August 9, 2017 Board Meeting.

RiverPlex Recreation and Wellness Center Boiler Replacement Ph. 2

Project Manager:  Becky Fredrickson

For consideration at the July 12, 2017 PPD Board Meeting.

Camp Wokanda Dining Hall Roof Replacement

Project Manager:  Mary Harden

Tentative award at June 14, 2017 board meeting.

Trewyn Roof Replacement Bid Tabulation

Project Manager:   Mike Friberg

For consideration at the May 10, 2017 Board Meeting.

RFQ- Quote Tabulation Golf Maintenance Relighting

 

Project Manager: Mary Harden

For consideration at the April 12, 2017 Board Meeting.

Sidewalk and Steps – Glen Oak Park

Project Manager:

Mike Friberg

For Board consideration at the November 16, 2016 Board Meeting.

Carpet Removal & Replacement Riverplex

Project Manager:

Mary Harden

 

Erosion Repair – Forest Park Nature Center @ High Point Terrace

Project Manager:

Becky Fredrickson

Roof Access Hatch – Proctor Recreation Center

Project Manager:

Becky Fredrickson

Boiler Replacement – Riverplex

Project Manager:

Becky Fredrickson

Sommer Park Barn and Cabin Roof Replacement

16-023BidTab

Project Manager:  Mike Friberg

 

Rocky Glen Park Parking Lot

Project Manager:  Becky Fredrickson

 

Award scheduled for August 10, 2016 Board Meeting.

Stormwater Improvements Grand View Dr. @ Bishop Ave. and IL Route 29

Project Manager:  Mike Friberg

 

Trewyn Park Pavilion Roof Replacement

Project Manager:  Mike Friberg

District Wide Sealcoating

Project Manager:

Mike Friberg

 

 

 

Project will be presented for approval at the June 8, 2016 Park Board meeting.

Robinson Park South Bridge Erosion Protection

Project Manager:

Mike Friberg

Awarded at Board meeting 5/11/16

Newman Golf Course Drainage and Forward Tees

Project Manager:

Becky Fredrickson

To be awarded at the April 13, 2016 Board Meeting

Peoria Zoo Takin Enclosure

Project Manager:

Rebecca Fredrickson

Awarded at the December 9, 2015 Board Meeting.

Forest Park Nature Center Cork Flooring

Project Manager:

Mary Harden

 

To be awarded at the December 16, 2015 Board Meeting.

Owens Recreation Center Restroom Renovation

Project Manager:

Mary Harden

To be awarded at the July 22, 2015 Board Meeting.

Camp Wokanda Bridge Erosion

Project Manager:

Mike Friberg

Low bid exceeded budget, analysis underway.

Attingham Park Trail Connection Bid Tabulation

Project Manager:

Mike Friberg

To be awarded at the April 8, 2015 Board Meeting.

District Wide Relighting

Project Manager: Zach Terry

Awarded.

Peoria Stadium Fencing

Project Manager:

Zach Terry

To be awarded at the December 10, 2014 Board Meeting.

Tropics Classroom Window Replacement

Project Manager:

Mary Harden

Proposal analysis underway.

Newman Golf Course Greens Bid Tab

Project Manager:

Becky Fredrickson

To be awarded at the March 25, 2015 Board meeting.

Madison Golf Course Concrete Ledge Repair Quote Tab

Project Manager:

Mary Harden

To be awarded at the April 8, 2015 Park Board Meeting.

Newman Golf Course Watermain and Fire Hydrant

Project Manager:

Mike Friberg

To be awarded at the October 22, 2014 Board Meeting

Lakeview Sidewalk Replacement

Project Manger:

Zach Terry

To be awarded at the September 24, 2014 Board Meeting.

Kinsey Memorial Fountain Stone Restoration

Project Manager:

Mary Harden

To Board Meeting on 09/24/2014 for approval.

District Wide Above Ground Storage Tanks

Project Manager:

Zach Terry

Awarded at the August 13, 2014 Board Meeting.

Wilhelm Trail

Project Manager:

Mary Harden

To be awarded at the August 27, 2014 Board Meeting.

Tawny Oaks Welcome Center Bid Tab

Project Manager:

Mary Harden

Bid analysis underway.

Bridge and Trail Landscaping Bid Tabulation

Project Manager:

Mike Friberg

To be awarded at the August 13, 2014 Board Meeting

Tawny Oaks Site Development Bid Tabulation

Project Manager:

Mary Harden

To be awarded at the June 11, 2014 Board Meeting.

Peoria Playhouse Children’s Museum Bid Tabulation

Project Manager:

Becky Fredrickson

Bid analysis underway

Charter Oak South Dam Repair

Project Manager:

Mike Friberg

To be awarded at the July 10, 2013 Board Meeting.

Owens Center Pedestrian Bridge Replacement

Project Manager:

Becky Fredrickson

To be awarded at the October 16, 2013 Board Meeting

Bike Trail Bridge and Approaches Bid Tabulation

Project Manager:

Mike Friberg

To be awarded at the July 24, 2013 Board Meeting

Lakeview Park Culvert and Road Repair

Project Manager:

Becky Fredrickson

To be awarded at the October 16, 2013 Board Meeting

Zoo Multi-Purpose Room Renovation

Project Manager:

Becky Fredrickson

To be awarded at the April 10, 2013 Board Meeting.

RTP Phase 3 Trailbuilding Bids

Project Manager:

Mike Friberg

To Be Awarded at the March 27, 2013 Board Meeting

Spanish Cannon Display Area

Project Manager:

Mike Friberg

To Be Awarded at the May 8, 2013 Board Meeting

GVD WWI Monument Proposal Tab.pdf

Project Manager:

Mary Harden

Awarded at the February 13, 2013 Board Meeting.

LFAC Waterslide Fiberglass Proposal Tab.pdf

Project Manager:

Mary Harden

Awarded at the February 13, 2013 Board Meeting

Lakeview Asbestos Bid Tab.pdf

Project Manager:

Rebecca Fredrickson

Awarded at the January 23, 2013 Board Meeting.

Grand View Drive Wire Rope Guardrail Quote Tabulation

Project Manager:

Mike Friberg

Award Pending

Green Valley Restroom Bid Tabulation

Project Manager:

Mike Friberg

To Board Meeting 11/28 for approval.

Fire Hydrant Removal Quote Tab

Project Manager:

Mike Friberg

Award Pending

Camp Wokanda West Cabin Windows Quote Tab

Project Manager:

Mike Friberg

Award Pending

ESC Small Parks Roof Replacement Bid Tabulation

Project Manager:

Glenn Kissinger

To be awarded at the September 26, 2012 Board Meeting.

Water Slide Structure Repair – Lakeview Family Aquatic Center

Project Manager:

Mike Friberg

Will go to Board Meeting on October 10, 2012

Project Manager:

Rebecca Fredrickson

Award Pending.

Bradley Park Sidewalk Replacement

Project Manager:

Rebecca Fredrickson

Award Pending.

Wilhelm Bike Trail Bid Tabulation

Project Manager:

Mary Harden

To be awarded at the September 26, 2012 Board Meeting.

Owens Ice Rink Relighting Quote Tab

Project Manager:

Rebecca Fredrickson

Award Pending.

Bradley Park Restroom Brick Work & Repointing Quote Tab

Project Manager:

Mary Harden

Award pending.

Block Wall- Golf Operations Facility Bid Tabulation

Project Manager:

Rebecca Fredrickson

To be awarded at the August 22, 2012 Board Meeting.

Furnace & AC Replacement – Bio Center Quote Tab

Project Manager:

Mary Harden

Award pending.

Grand View Drive Erosion Remediation Bid Tabulation

Project Manager:

Mike Friberg

To be awarded at the August 8th, 2012 Board Meeting.

Hiking Trail Bridges at Green Valley Camp Bid Tabulation

Project Manager:

Mike Friberg

Awarded to Bishop Bros. July 12, 2012

Bradley Service Building Bid Tab

Project Manager:

Glenn Kissinger

To be awarded at the May 23 Park Board Meeting

Laura Bradley Park Storm Sewer Improvements Bid Tab

Project Manager:

Mike Friberg

awarded to Krumholz Brothers Landscaping July 12, 2012.

Equipment Service Center Auto Service Building Roof Bid Tab

Project Manager:

Glenn Kissinger

To be awarded at the June 27, 2012 Board Meeting

Forest Park Nature Center Window Replacement

Project Manager:

Mary  Harden

Awarded.

Window Replacement-Riverplex Recreation and Wellness Center

Project Manager:

Rebecca Fredrickson

All bids rejected.

Conservatory Vent Repairs- Luthy Botanical Garden

Project Manager:

Mary Harden

All proposal rejected. Project in re-design.

HikingTrail Improvements Rte 6 ROW

Project Manager:

Mike Friberg

Awarded to PA Atherton

Madison Clubhouse Roof Replacement PhasIe II Bid Tab.pdf

Project Manager:

Glenn Kissinger/Mary Harden

To be awarded at the November 9, 2011 Board Meeting.

Shelter and Concrete Work at Safety Town

Project Manager:

Mike Friberg

Awarded to C and G Concrete

Clubhouse Renovation at Kellogg Golf Course Bid Tab

Project Manager:

Rebecca Fredrickson

Awarded at the December 7, 2011 Board Meeting.

Australia Walk-About Bid Tab.pdf

Project Manager:

Mary Harden

To be awarded at the January 11, 2012 Board Meeting.

Forest Park Nature Center Relighting Quote Tabulation

Project Manager:

Mike Friberg

To be awarded week of January 23

Sommer Park Water Main Extension

Project Manager:

Mike Friberg

To be awarded at the February 8, 2012 Board Meeting.

Glen Oak Park Tennis Court Reconstruction

Project Manager:

Mary Harden

Possible Award at February 8th Board Meeting

Central Park Pool Lower Roof Repairs

Project Manager:

Mary Harden

Awarded to M.C.S., Inc. at the February 22, 2012 Board Meeting.

Peoria Zoo 4″ Conduit

Project Manager:

Rebecca Fredrickson

To be awarded at the March 14, 2012 Board Meeting.

Australian Walk-about and Aviary Bid Tab.pdf

Project Manager:

Mary Harden

 

ALL BIDS REJECTED DUE TO BUDGET. PROJECT IN RE-DESIGN.

Tawny Oaks Natural Planting

Project Manager:

Becky Fredrickson

Awarded at the August 10, 2011 Board Meeting.

Proctor Recreation Center Tile Roof Bid Tabulation

Project Manager:

Glenn Kissinger

To be awarded at the January 12, 2011 Board Meeting.

Sommer Park Prairie Shelter Roof Replacement Bid Tabulation

Project Manager:

Glenn Kissinger

To be awarded at the March 9, 2011 Board Meeting

Family Restroom at Safety Town Bid Tabulation

Project Manager:

Mike Friberg

To be awarded at the April 13, 2011 Board Meeting

Riverfront Office Roof Replacement

 

Project Manager:

Glenn Kissinger

To be awarded at the May 11, 2011 Board Meeting.

Proctor Recreation Center Outdoor Restroom and Storage Building Reconstruction 

Project Manager:

Mary Harden

Project awarded at the August 10, 2011 Board Meeting.

Kellogg Golf Course Renovation Bid Tab

Project Manager:

Becky Fredrickson

To be awarded at the July 27, 2011 Board Meeting.

Charter Oak South Dam Repair Quote Tabulation

Project Manager:

Mike Friberg

To be awarded at the January 12, 2011 Board Meeting

Rock Island – Pimiteoui Trail Phase 1 Bid Tab

Project Manager:

Mike Friberg

Awarded at the October 13, 2010 Board meeting.

Glen Oak Pavilion Porch Painting Bid Tab

Project Manager:

Glenn Kissinger

Awarded at the October 13, 2010 Board Meeting

Wilhelm Trail Bid Tab.pdf

Project Manager:

Mary Harden

Awarded at the October 13, 2010 Board Meeting.

Project Manager:

Glenn Kissinger

Awarded at the August 25th, 2010 Board Meeting

Grand View Drive Storm Sewer

Project Manager:

Mike Friberg

Awarded at the August 25, 2010 Board meeting.

Partial Roof Replacement Phase 2 – Leo Donovan Golf Course Clubhouse

Project Manager:

Glenn Kissinger

Awarded at the March 24, 2010 Board meeting

Bid Tabulation – OA Lodge at Camp Wokanda

Project Manager:

Glenn Kissinger

Awarded at the March 24, 2010 Board Meeting

Owens Rubber Floor ReplacementNO  BIDS  RECEIVED

Project Manager:

Becky Fredrickson

Project in re-design.

Softball Field Fencing at Peoria Stadium – Phase 2

Project Manager:

Mike Friberg

Awarded at the May 26, 2010 Board Meeting.

Luthy Irrigation Phase III

Project Manager:

Mary Harden

Awarded at the July 14, 2010 Board Meeting.

Controlled Burns – Robinson Park and Camp Wokanda

Project Manager:

Becky Fredrickson

Awarded at the July 28, 2010 Board Meeting.

Madison Golf Course Partial Roof Replacement Ph I.pdf

Project Manager:

Glenn Kissinger

Will be recommended for award at the August 25, 2010 Board Meeting.

Grand View Drive Pavilion Roof Replacement Bid Tab

Project Manager:

Glenn Kissinger

Awarded at the March 10, 2010 Board Meeting

Modifications to Swimming Pool Drains Bid Tab.pdf

Project Manager:

Becky Fredrickson

Awarded at the March 10, 2010 Board Meeting

Proctor Park Redevelopment-Bid Tab.pdf

Project Manager:

Mary Harden

Awarded at the February 24, 2010 Board Meeting

North Fork Dry Run  Creek Bridge – Laura Bradley Park

Project Manager:

Mike Friberg

Awarded at the October 28, 2009 Board Meeting.

 

Central Park Pool Roof Repair

Project Manager:

Mary Harden

Awarded at the October 28, 2009 Board Meeting.

Peoria Stadium Softball Field Fencing

Project Manager:

Mike Friberg

Awarded at the October 28, 2009 Board Meeting.

Partial Roof Replacement – Leo Donovan Golf Course Clubhouse

Project Manager:

Glenn Kissinger

To be awarded at September 9, 2009 Board Meeting

North Fork Dry Run Creek Bridge – Laura Bradley Park

Project Manager:

Mike Friberg

ALL BIDS REJECTED DUE TO BUDGET.

Project will be re-bid in Request For Proposal format. New Project Manuals will be available on 9/16/09. We appreciate everyone who spent so much time and effort to give us good bids, and apologize for reaching a bit too far in our plans.

Luthy Botanical Garden Gift Shop Roof Replacement

Project Manager:

Glenn Kissinger

Awarded at August 26th 2009 Board Meeting

Peoria Stadium Softball Fields Relighting

Project Manager:

Mike Friberg

Awarded at August 26th 2009 Board Meeting

Grand View Drive Pavilion Cleaning and Painting

Project Manager:

Mary Harden

Awarded at August 26 Board Meeting

Owens Center Cooling Tower Installation

Project Manager:
Glenn Kissinger

Awarded at 6/24/09 Board Meeting

back to top

 

Latest Bids & Projects

  • Locker Room Renovation Phase 2 - Riverplex
  • Boiler Replacement - Peoria Players Theater - 2nd bid
  • Stormwater Inlet Replacement - Peoria Playhouse Children's Museum
  • Pavement Patching at Grand View Drive
  • Site Improvements Forest Park Nature Center
  • Exterior Door Replacement- Forest Park Nature Center

Peoria Park District Home
1125 W. Lake Avenue
Peoria, IL 61614· USA

Pleasure Driveway and Park District of Peoria, Illinois Planning, Design, and Construction Division 1314 N. Park Road Peoria, Illinois 61604
Phone: 309-686-3386
Fax: 309-686-3383
Email: mfriberg@peoriaparks.org
  • Facebook
  • Twitter

Copyright© 2023