| Project | Information | Dates |
|
Bike Trail Bridge and Approaches Download Planholder List (CSV) |
Project Manager: Mike Friberg
PLEASE NOTE: The project manual and plans download is a large file (60 MB) and may take significant time to download. After filling in your contact information for the official planholders list, and clicking download, check your web browsers prompt (usually in yellow at the bottom or top of your screen) for where on your computer you want the file to download. This website itself will not let you know when the download is complete; that's up to your web browser. |
Pre-Bid meeting to be held on Monday June 24, 2013 at 1:30 p.m. at the project site. Bids are due Tuesday, July 2, 2013 at 1:30 p.m. at the Peoria Park District Administrative offices in Glen Oak Park. |
Request for Quote: Colobus Dayroom Window Replacement at the Peoria Zoo For quote documents, click HERE. |
A pre-quote meeting will be held at the site on Thursday, June 20, 2013 at 10:00 a.m. Please meet at gate 8. All quotes to be considered shall be submitted on or before Friday, June 28, 2013 at 2:00 p.m. Quotes shall be sent to Mary Harden at the Planning, Design and Construction Division, 1314 N. Park Road, Peoria, IL 61604. Quotes can also be emailed to mharden@peoriaparks.org or faxed to 686-3383. | |
|
CharterOakSouthDamRepair Download Planholder List (CSV) |
Project Manager: Mike Friberg |
Pre-Bid: Tuesday June 18, at 10:00 a.m. at the project site. Bids Due: Tuesday June 25, at 1:30p.m. at the Glen Oak Pavilion. |
Request for Quote: Madison Golf Course Clubhouse Limestone Pier Caps. For Quote documents, click HERE. |
A pre-quote meeting will be held at the site on Monday, May 6, 2013 at 2:00 p.m. Quotes are due by 2:00p.m. on or before Friday, May 10, 2013 at the Planning, Design and Construction Division offices in Bradley Park. Quotes can be faxed to 309-686-3383, emailed to mharden@peoriaparks.org, hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604. | |
|
Adventure Grove Site Development Download Planholder List (CSV) |
Project Manager: Mike Friberg For Addendum #1, click HERE |
Pre-Bid Meeting: Tuesday, April 23, 2013 at 10:00 a.m. at the project site. Bids Due: Tuesday May 7, 2013 at 1:30 p.m. at the Glen Oak Pavilion, 2218 N. Prospect, Peoria, IL. |
|
RFP--World War I Monument Restoration-Grand View Drive Download Planholder List (CSV) |
Project Manager: Mary Harden |
A mandatory pre-proposal meeting will be held at the project site on Tuesday, January 15, 2013 at 1:00 p.m.
Prposals are due at 1:30 p.m. on Tuesday, January 29, 2013 at the Admin Office located in Glen Oak Pavilion, 2218 N. Prospect, Peoria, IL. |
|
RFP-LFAC Waterslide Fiberglass Repairs- Slide A Download Planholder List (CSV) |
Project Manager: Mary Harden |
A pre-proposal meeting will be held at the project site on Tuesday, January 22, 2013 at 10:00 a.m.
Proposals are due at 1:00 p.m. Tuesday, January 29, 2013 at the Admin Office located in Glen Oak Pavilion, 2218 N. Prospect, Peoria, IL . |
|
Design Build Services for Lakeview Center Renovation Download Planholder List (CSV) |
Project Manager: Rebecca Fredrickson
Click HERE for Addendum #1
Click HERE for 1963 original floor plans of Lakeview. Please note that this download is over 300MB in pdf format and may easily take 5-10 minutes to download. |
Pre-Proposal Meeting January 23, 2013 at 10:00 a.m. Proposals are due March 5, 2013 at 1:30 p.m. at the Administrative Offices located in Glen Oak Pavilion. |
|
Trail Construction RTP Phase 3 -Green Valley Camp Project Manual Download Planholder List (CSV) |
Please note that this project has specific Contractor qualifications noted in the specifications, and trailbuilding references are required to be submitted with the bid. Please also note that the Project Manaul is a large download, due to the inclusion of a large aerial photo and topographic map in the manual.
Project Manager: Mike Friberg
For Addendum #1 Please Click HERE For Addendum #2 Please Click HERE |
Bidding period has been extended to Thursday, March 14, 2013 |
|
Tiger Fence Modifications Project Manual Download Planholder List (CSV) |
Project Manager: Becky Fredrickson |
Pre-Bid on Tuesday, February 12, 2013 at 10:00 a.m. at the project site.
Bids Due: Tuesday, February 19, 2013, at 1:30 p.m. at the Glen Oak Pavilion. |
|
Spanish Cannon Display Download Planholder List (CSV) |
Project Manager: Mike Friberg |
Bids received until Tuesday March 12, 2013 at 1:30 p.m. at the Glen Oak Pavilion Pre-Bid meeting on Tuesday, March 5, 2013 at 10:30 a.m. at the Project Site. |
|
ZooMultiPurposeRoomRenov Download Planholder List (CSV) |
Project Manager: Becky Fredrickson
For Addendum #1 Click HERE |
Pre-Bid on Wednesday, March 27th, 2013 at 10:00 a.m. at the project site.
Bids are due on Wednesday April 3, 2013, at 11:00 a.m. at the Glen Oak Pavilion |
Request for Quotes: Water Service for Restroom Building- Green Valley Camp
For Quote documents, click HERE |
Quotes are due by Friday, April 19, 2013 at 2:00 p.m. at the Planning, Design, and Construction Division offices in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mfriberg@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604. | |
Request for Quotes: Wire Rope Guardrail - Grand View Drive at Miller Ave. Please click HERE for RFQ package |
Quotes are due by Tuesday, December 18, 2012 at 2:00 p.m. at the Planning, Design, and Construction Division offices in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mfriberg@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604. | |
|
RFP-Asbestos Abastement- Lakeview Center Download Planholder List (CSV) |
Click HERE for Addendum #1 Click HERE for Addendum #2
Project Manager: Rebecca Fredrickson |
A Pre-proposal meeting will be held at the project site at 10:00 a.m. on Wednesday, November 21, 2012. Proposals are due at 1:30 p.m. on Tuesday, January 8, 2013 at the Admin office located in Glen Oak Pavilion, 2218 N. Prospect, Peoria, IL. |
Curb and Gutter Replacement Glen Oak Park
Click HERE for RFQ package. |
Quotes are due Tuesday, September 18, 2012 by 2:00 p.m. at the Planning, Design, and Construction Division offices in Bradley Park. Quotes can be faxed, emailed, or hand -delivered. No bid bond is required. | |
|
Waterslide Structure Repair - Lakeview Family Aquatic Center Download Planholder List (CSV) |
For Addendum #1, Click HERE
Please read addendum #1 to understand the limitations of the report before downloading the following. For Structural Report with photographs, click HERE
Project Manager: Mike Friberg |
Pre-Bid: Tuesday September 18, 2012 at 9:00 a.m. Bids Due: Tuesday September 25, 2012 at 1:30 p.m. |
Request for Quotes- African Lodge Entry Lighting Peoria Zoo at Glen Oak Park Please click HERE for RFQ package. |
Quotes are due on Tuesday, October 23, 2012 by 2:00 p.m. at the Planning, Design and Construction office located in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to rfredrickson@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604. | |
Request for Quotes - Animal Hospital Double Doors Peoria Zoo in Glen Oak Park
Please click HERE for RFQ package. |
Quotes are due Wednesday, October 24, 2012 by 2:30 p.m. at the Planning, Design and Construction office located in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mharden@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604. | |
Request for Quotes- Fire Hydrant Removal Please click HERE for RFQ package. |
Quotes are due by Friday October 26, 2012 at 2:00 p.m. at the Planning, Design, and Construction Division offices in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mfriberg@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604. | |
Request for Quotes: West Cabin Windows at Camp Wokanda Please click HERE for RFQ package. |
Quotes are due by Thursday October 25, 2012 at 2:00 p.m. at the Planning, Design, and Construction Division offices in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mfriberg@peoriaparks.org, or hand delivered to the Planning Office at 1314 N. Park Road, Peoria, IL 61604. | |
|
Family Restroom at Green Valley Camp Download Planholder List (CSV) |
Click HERE for Addendum #1 Click HERE for Addendum #2
Project Manager: Mike Friberg |
A Pre-Bid meeting will be held at the project site at 10:30 a.m. on Tuesday November 6, 2012. Bids are due at 1:30 p.m.on Tuesday, November 13, 2012 at the Glen Oak Pavilion. |
Sidewalk Replacement Laura Bradley Park
Click HERE for RFQ package. |
Quotes are due Tuesday, September 18, 2012 by 2:00 p.m. at the Planning, Design, and Construction Division offices located in Bradley Park. Quotes may be faxed, emailed, or hand-delivered. No bid bond is required. | |
|
Bradley Park ESC Small Parks Roof Replacement Download Planholder List (CSV) |
Project Manager: Glenn Kissinger |
A pre-bid meeting will be held at the site on Tuesday, September 11, 2012 at 1:30 p.m.
Bids are due Tuesday, September 18, 2012 at 1:30 p.m. at Glen Oak Pavilion. |
|
Wilhelm Bike Trail Project Manual Download Planholder List (CSV) |
Project Manager: Mary Harden |
A pre-bid meeting will be held at 10:00a.m. on Tuesday, Sept. 11, 2012. Please meet at the intersection of Country Ridge Lane and Wilhelm. Bids are due Tuesday, September 18, 2012 at 1:45 p.m. at Glen Oak Pavilion. |
Replacement Windows and Trim Sommer Park Residence and Park Office
Clicke HERE for RFQ
|
Quotes are due August 10, 2012 at 4:00 p.m. Division office is located in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to mfriberg@peoriaparks.org, or hand delivered to the address noted above.
| |
Furnace and Air Conditioner Replacement Bio Center at the Peoria Zoo in Glen Oak Park
Click HERE for RFQ. |
Quotes are due Thursday, August 9, 2012 by 2:00p.m.. Quotes can be faxed to (309) 686-3383, emailed to mharden@peoriaparks.org or hand delivered to the Planning Office, located in Bradley Park, 1314 N. Park Road, Peoria, IL . | |
Brick Repointing and Brick Replacement Bradley Park
Click HERE for RFQ. |
Quotes are due on August 14, 2012 by 2:00p.m.. Quotes can be faxed to 309-686-3383, emailed to mharden@peoriaparks.org, or hand delivered to the Planning Office, located in Bradley Park, 1314 N. Park Road, Peoria, IL. | |
|
Block Wall - Golf operations Facility Download Planholder List (CSV) |
Project Manager: Rebecca Fredrickson |
Pre-bid at the project site on Tuesday, August 7, 2012.
Bids due Tuesday, August 14, 2012. |
Ice Rink Relighting - Owens Recreation Center
Click HERE for RFQ. |
Quotes are due on Tuesday, August 28, 2012 by 2:00p.m. Quotes can be faxed to (309) 686-3383, emailed to rfredrickson@peoriaparks.org or hand delivered to the Planning Office, located in Bradley Park, 1314 N. Park Road, Peoria, IL. | |
|
Conservatory Vent Repairs - Luthy Botanical Gardens Download Planholder List (CSV) |
Project Manager: Mary Harden |
A Pre-Proposal meeting will be held at the project site on July 24, 2012 at 10:00 a.m.. Proposals are due Tuesday, July 31, 2012, at 1:30 p.m. at the Glen Oak Pavilion. |
|
Grand View Drive Erosion Remediation Download Planholder List (CSV) |
Project Manager: Mike Friberg |
A MANDATORY pre-bid meeting will be held at the project site on Tuesday, July 24, 2012 at 9:30 a.m.. Contractors not attending may be disqualified from bidding.
Bids are due Tuesday, July 31, 2012 at 1:45 p.m. at the Glen Oak Pavilion Board Room. |
|
Locker Room Carpet Replacement - RiverPlex Download Planholder List (CSV) |
Project Manager: Rebecca Fredrickson |
A Pre-Bid meeting will be held at the RiverPlex Recreation and Wellness Center on Tuesday, July 24, 2012 at 9:00 a.m.
Bids are due Tuesday July 31, 2012 at 1:00 p.m. at the Glen Oak Pavilion
|
|
Interior Painting - RiverPlex Download Planholder List (CSV) |
Project Manager Rebecca Fredrickson |
A Pre-Bid meeting will be held at the RiverPlex Recreation and Wellness Center on Tuesday, July 24, 2012 at 9:30 a.m. Bids are due Tuesday July 31, 2012 at 1:15 p.m. at the Glen Oak Pavilion. |
Riverplex Waterslide Stair Painting
Click HERE for RFQ.
Project Manager: Rebecca Fredrickson |
Quotes will be due on Tuesday, July 17, 2012 by 2:00 p.m. at the Planning, Design and Construction Division office located in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to rfredrickson@peoriaparks.org or hand delivered to the address noted above.
| |
Central Park Pool Water Heater Replacement.
Click HERE for RFQ package.
Project Manager: Rebecca Fredrickson |
Quotes will be due on Tuesday, July 17, 2012 by 2:00 p.m. at the Planning, Design and Construction Division office located in Bradley Park. Quotes can be faxed to (309) 686-3383, emailed to:
or hand delivered to the address noted above.
| |
Forest Park Nature Center Window Replacement Click HERE for RFQ Package |
A Pre-Quote Meeting will be held at the site on Tuesday, June 19, 2012 at 1:30 p.m. All quotes to be Quotes may be faxed, emailed, or mailed to the Planning Division offices. | |
|
Hiking Trail Bridges - Green Valley Camp - IRBT Phase 3 Download Planholder List (CSV) |
Project Manager: Mike Friberg |
A Pre-Bid meeting will be held on June 20, 2012, at 10:00 a.m. Meet at the corner of E. Fairview Street and E. Brookview Lane, after which the Owner's Representative will lead potential bidders tot he project site by private gravel road. |
|
Window Replacement - Riverplex Recreation and Wellness Center Download Planholder List (CSV) |
Project Manager: Rebecca Fredrickson |
A Pre-Bid meeting will be held at the Project site on June 13, 2012 at 10:00 a.m. Bids due Wednesday, June 20, 2012 at 10:00 a.m.
|
|
Auto Service Building Roof Replacement Download Planholder List (CSV) |
Project Manager: Glenn Kissinger Click HERE for Addendum #1 Click HERE for Addendum #2 |
A Pre-Bid meeting will be held on Tuesday, June 12, 2012 at 1:00 p.m. Bids are due Tuesday, June 19, 2012 at 1:30 p.m. |
|
Storm Sewer Improvements - Bradley Park Download Planholder List (CSV) |
Project Manager: Mike Friberg |
A Pre-Bid meeting will be held at the project site on Tuesday, June 12, 2012 at 9:00 a.m. Bids are due Tuesday, June 19, 2012 at 2:00 p.m.
|
|
Bradley Park Service Building Roof Replacement Download Planholder List (CSV) |
Click HERE for Addendum #1
Project Manager: Glenn Kissinger |
A Pre-Bid Meeting will be held Tuesday, May 8, 2012 at 1:00 p.m. Bids are due by 1:30 p.m. Tuesday, May 15, 2012 at the Glen Oak Park Pavilion. |
Bike Trail Slope Hydroseeding Click HERE for RFQ documents. |
Pre-Quote Tuesday, May 8, 2012 at 10:00 a.m.. Meet at the end of Candletree Drive. | |
|
Proctor Tile Roof PhIV Download Planholder List (CSV) |
Click HERE for Addendum #2 Click HERE for Addendum #1.
Project Manager: Glenn Kissinger |
Pre-Bid meeting on-site 1:00 p.m. Monday, May 7, 2012. Bids due 1:30 p.m. Tuesday, June 5, 2012 at the Glen Oak Pavilion. |
|
RFP Luthy Conservatory Vent Repairs Download Planholder List (CSV) |
Click HERE for Addendum #1.
Project Manager: Mary Harden |
Pre-proposal meeting is scheduled for Tuesday, April 24, 2012 at 10:30 a.m. at Luthy Botanical Garden.
Proposals due: Tuesday, May 1, 2012 at 1:30 p.m. at the Park District Administrative Office in Glen Oak Park.
|
|
Hiking Trail Improvements Route 6 ROW Download Planholder List (CSV) |
This project includes: Traffic control on Route 6, tree clearing and grubbing, installation of chain link fencing and gates, construction of wood trail steps and boardwalk, wire mesh fence modification and removal, and restoration of the site.
Click HERE for Addendum #1.
Project Manager: Mike Friberg |
Pre-Bid Meeting: April 4th at 2:00 p.m. Please note time change! Due to Access restrictions by IDOT, approach to the project site will be "cross country" hiking for approximately 1100 feet through rough and hilly terrain. Please meet at the corner of E. Fairview Street and E. Brookview Lane, after which the Owner's Representative will lead potential bidders to the project site via private gravel road and then by foot. Bids Due: Tuesday April 10, 2012 at 9:30 a.m. |
|
Safety Town Shelter and Concrete Work Download Planholder List (CSV) |
Project Manager: Mike Friberg
Click HERE for Addendum #1 |
Pre-Bid Meeting: Thursday, March 29 at 9:00 a.m. at Safety Town - 6518 N. Sheridan Road Bids Due: April 3, 2012 at 1:30 p.m. |
Block Wall Demolition and Removal - Golf Operations Facility 6017 N. Knoxville Ave. Click HERE for RFQ
Project Manager: Becky Fredrickson |
Quotes are due Thursday March 22, 2012 by 2:00 p.m. at the Planning, Design, and Construction Division offices located in Bradley Park. | |
|
Aviary Design and Construction RFP Download Planholder List (CSV) |
Project Manager: Mary Harden |
Proposals are due at 1:30 p.m. on Thursday, March 15, 2012 at the Park District Administrative Office in Glen Oak Park. |
| Project | Information | Status |
Project Manager: Becky Fredrickson |
To be awarded at the April 10, 2013 Board Meeting. | |
Project Manager: Mike Friberg |
To Be Awarded at the March 27, 2013 Board Meeting | |
Project Manager: Mike Friberg |
To Be Awarded at the May 8, 2013 Board Meeting | |
Project Manager: Mary Harden |
Awarded at the February 13, 2013 Board Meeting. | |
Project Manager: Mary Harden |
Awarded at the February 13, 2013 Board Meeting | |
Project Manager: Rebecca Fredrickson |
Awarded at the January 23, 2013 Board Meeting. | |
Project Manager: Mike Friberg |
Award Pending | |
Project Manager: Mike Friberg |
To Board Meeting 11/28 for approval. | |
Project Manager: Mike Friberg |
Award Pending | |
Project Manager: Mike Friberg |
Award Pending | |
Project Manager: Glenn Kissinger |
To be awarded at the September 26, 2012 Board Meeting. | |
Water Slide Structure Repair - Lakeview Family Aquatic Center |
Project Manager: Mike Friberg |
Will go to Board Meeting on October 10, 2012 |
Project Manager: Rebecca Fredrickson |
Award Pending. | |
Project Manager: Rebecca Fredrickson |
Award Pending. | |
Project Manager: Mary Harden |
To be awarded at the September 26, 2012 Board Meeting. | |
Project Manager: Rebecca Fredrickson |
Award Pending. | |
Project Manager: Mary Harden |
Award pending. | |
Project Manager: Rebecca Fredrickson |
To be awarded at the August 22, 2012 Board Meeting. | |
Project Manager: Mary Harden |
Award pending. | |
Project Manager: Mike Friberg |
To be awarded at the August 8th, 2012 Board Meeting. | |
Project Manager: Mike Friberg |
Awarded to Bishop Bros. July 12, 2012 | |
Project Manager: Glenn Kissinger |
To be awarded at the May 23 Park Board Meeting | |
Project Manager: Mike Friberg |
awarded to Krumholz Brothers Landscaping July 12, 2012. | |
Project Manager: Glenn Kissinger |
To be awarded at the June 27, 2012 Board Meeting | |
Project Manager: Mary Harden |
Awarded. | |
Project Manager: Rebecca Fredrickson |
All bids rejected. | |
Project Manager: Mary Harden |
All proposal rejected. Project in re-design. | |
Project Manager: Mike Friberg |
Awarded to PA Atherton | |
Project Manager: Glenn Kissinger/Mary Harden |
To be awarded at the November 9, 2011 Board Meeting. | |
Project Manager: Mike Friberg |
Awarded to C and G Concrete | |
Project Manager: Rebecca Fredrickson |
Awarded at the December 7, 2011 Board Meeting. | |
Project Manager: Mary Harden |
To be awarded at the January 11, 2012 Board Meeting. | |
Project Manager: Mike Friberg |
To be awarded week of January 23 | |
Project Manager: Mike Friberg |
To be awarded at the February 8, 2012 Board Meeting. | |
Project Manager: Mary Harden |
Possible Award at February 8th Board Meeting | |
Central Park Pool Lower Roof Repairs |
Project Manager: Mary Harden |
Awarded to M.C.S., Inc. at the February 22, 2012 Board Meeting. |
Peoria Zoo 4" Conduit |
Project Manager: Rebecca Fredrickson |
To be awarded at the March 14, 2012 Board Meeting. |
Project Manager: Mary Harden
|
ALL BIDS REJECTED DUE TO BUDGET. PROJECT IN RE-DESIGN. | |
Tawny Oaks Natural Planting |
Project Manager: Becky Fredrickson |
Awarded at the August 10, 2011 Board Meeting. |
Project Manager: Glenn Kissinger |
To be awarded at the January 12, 2011 Board Meeting. | |
Project Manager: Glenn Kissinger |
To be awarded at the March 9, 2011 Board Meeting | |
Project Manager: Mike Friberg |
To be awarded at the April 13, 2011 Board Meeting | |
Project Manager: Glenn Kissinger |
To be awarded at the May 11, 2011 Board Meeting. | |
Proctor Recreation Center Outdoor Restroom and Storage Building Reconstruction |
Project Manager: Mary Harden |
Project awarded at the August 10, 2011 Board Meeting. |
Project Manager: Becky Fredrickson |
To be awarded at the July 27, 2011 Board Meeting. | |
Project Manager: Mike Friberg |
To be awarded at the January 12, 2011 Board Meeting | |
Project Manager: Mike Friberg |
Awarded at the October 13, 2010 Board meeting. | |
Project Manager: Glenn Kissinger |
Awarded at the October 13, 2010 Board Meeting | |
Project Manager: Mary Harden |
Awarded at the October 13, 2010 Board Meeting. | |
Project Manager: Glenn Kissinger |
Awarded at the August 25th, 2010 Board Meeting | |
Project Manager: Mike Friberg |
Awarded at the August 25, 2010 Board meeting. | |
Partial Roof Replacement Phase 2 - Leo Donovan Golf Course Clubhouse |
Project Manager: Glenn Kissinger |
Awarded at the March 24, 2010 Board meeting |
Project Manager: Glenn Kissinger |
Awarded at the March 24, 2010 Board Meeting | |
Owens Rubber Floor Replacement NO BIDS RECEIVED |
Project Manager: Becky Fredrickson |
Project in re-design. |
Project Manager: Mike Friberg |
Awarded at the May 26, 2010 Board Meeting. | |
Project Manager: Mary Harden |
Awarded at the July 14, 2010 Board Meeting. | |
Project Manager: Becky Fredrickson |
Awarded at the July 28, 2010 Board Meeting. | |
Project Manager: Glenn Kissinger |
Will be recommended for award at the August 25, 2010 Board Meeting. | |
Project Manager: Glenn Kissinger |
Awarded at the March 10, 2010 Board Meeting | |
Project Manager: Becky Fredrickson |
Awarded at the March 10, 2010 Board Meeting | |
Project Manager: Mary Harden |
Awarded at the February 24, 2010 Board Meeting | |
Project Manager: Mike Friberg |
Awarded at the October 28, 2009 Board Meeting.
| |
Project Manager: Mary Harden |
Awarded at the October 28, 2009 Board Meeting. | |
Project Manager: Mike Friberg |
Awarded at the October 28, 2009 Board Meeting. | |
Partial Roof Replacement - Leo Donovan Golf Course Clubhouse |
Project Manager: Glenn Kissinger |
To be awarded at September 9, 2009 Board Meeting |
Project Manager: Mike Friberg |
ALL BIDS REJECTED DUE TO BUDGET. Project will be re-bid in Request For Proposal format. New Project Manuals will be available on 9/16/09. We appreciate everyone who spent so much time and effort to give us good bids, and apologize for reaching a bit too far in our plans. | |
Project Manager: Glenn Kissinger |
Awarded at August 26th 2009 Board Meeting | |
Project Manager: Mike Friberg |
Awarded at August 26th 2009 Board Meeting | |
Project Manager: Mary Harden |
Awarded at August 26 Board Meeting | |
Project Manager: |
Awarded at 6/24/09 Board Meeting |